All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to the Rapid
Infiltration Pit within the site.
19. All site stormwater drainage shall be by means of a gravity system.
Town Water Supply
20. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
21. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Service Easements (Sewer)
22. No building or other structure shall be constructed or encroach over an easement.
Earthworks
23. Earthworks carried out on site shall not affect the structural integrity of any of the existing
structures that border the development site. Any affected structures shall be replaced prior to
the Building Certifier issuing the Certificate of Classification. In this regard any structures to
be replaced shall be clearly shown on the plans submitted for Building Works approval.
Erosion and Sediment Control
24. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard, plans detailing the methods of controlling erosion and sediment in accordance
with the Healthy Waterways document and fact sheet series titled “Controlling Stormwater
Pollution on your Building Site dated 2006” are required to be submitted with the application
for a Building Works Permit.
General
25. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
26. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
27. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The plans and / or documents recommended for approval are listed in the following table:
Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council's Recommendation to Noosa Iconic Panel - 010.2008.00001927.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 32 KB (small file)
- File type
No other editions are linked here.