Site Based Sotrmwater Management Plan
In reply please refer to:
Our: Troy Paulsen
At: Sunshine Coast
Our Ref: SC-8839
24th February 2021
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
RE: SITE BASED STORM WATER MANAGEMENT PLAN FOR PROPOSED
APPARTMENTS AT 31 BOTTLEBRUSH AVE, NOOSAVILLE
1. INTRODUCTION
The proposed development consists of a multi-apartment development and associated car
parking. The site is fronting Bottlebrush Ave to the South West and existing residential
allotments to the remaining boundaries. The site is currently occupied by a single two story
residential dwelling with its associated access driveway. The total site area is 506m 2 and has an
approximate fraction impervious of 46% (Fi = 0.46).
2. STORMWATER CONNECTION
Under existing conditions, stormwater runoff discharges to the kerb and channel fronting the
subject site, before falling to the North West before flowing into the existing 300mm diameter
underground stormwater network. The proposed stormwater will continue to discharge into the
Bottlebrush Ave kerb and channel in accordance with local council’s discharge flow rates of
maximum 25L/s.
3. STORMWATER QUANTITY
The proposed development will increase the impervious nature of the site compared to pre-
development to a fraction impervious of 80% (Fi = 0.80). Therefore, peak flow mitigation is
proposed to limit minor and major flows (50%, 20%, 10%, 5%, 2% & 1% AEP), to that of the
pre-development scenario to ensure the downstream pipe capacity is not worsened.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Site Based Sotrmwater Management Plan.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.