Site Based Sotrmwater Management Plan
Detention will be incorporated in the post-development scenario for the minor events that will
discharge into the existing kerb and channel. XP-STORM V2017.2 was used to determine the
detention volume required and the results are illustrated in Table 1.1. Table 1.1 illustrates that
10kL of detention with two 100mm diameter outlet mitigates the minor event discharge to less
than the required 25L/s flow rate and less than the pre-development scenario.
A concept stormwater management plan has been provided in Attachment 1, and hydrographs
have been attached in Attachment 2.
AEP (ARI) Pre-Development Post-Development Peak
Peak Flows Flows (Mitigated)
50% (2yr) 0.024 0.015
20% (5yr) 0.033 0.018
10% (10yr) 0.043 0.020
5% (20yr) 0.049 0.021
2% (50yr) 0.046 0.023
1% (100yr) 0.051 0.025
Table 1.1 – Pre vs Post Development Discharge
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Site Based Sotrmwater Management Plan.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.