Earthworks
38. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with any natural watercourses.
39. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences that border the development site unless it is intended to replace such fences. In this
regard any fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
Erosion and Sediment Control
40. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
Plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
41. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
42. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
43. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
44. A Registered Professional Engineer of Queensland shall certify engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
Building Services
45. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the Planning
Scheme.
Environmental Health
46. The developer must provide a suitably screened imperviously paved area large enough for all
refuse and recycling containers. A wash down area is required with a cold-water tap, hose and
drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry
to the sewerage system.
47. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
fines apply for such offences.
48. All lift plant including motors, shall be situated within the building or suitably provided with
noise reduction measures and located as to prevent a noise nuisance beyond the subject land
in accordance with the nuisance provisions of the Environmental Protection Regulation 1998.
On the spot fines apply for such offences.
49. Noise emission from air conditioning equipment shall comply with the following requirements:
Page 6 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2003.00221172.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.