Corporate Plan Theme 4: Long term planning for
Noosa Shire
“Noosa Shire is well managed and sustainable”
• Council undertook significant work on the management exercises to train our staff. Our long
development of the new Planning Scheme during serving Local Disaster Co-ordinator stepped down
2017/18. Council adopted the New Noosa Plan from the role on 30 June 2018 and was replaced
in May 2018 for the purpose of the State interest by Council’s Director Infrastructure Services.
review step of the new plan making process. We Council also adopted the Noosa Local Recovery
have undertaken a large range of studies and Sub-plan 2018 to guide recovery processes in the
assessments to support the development of the event that a major disaster occurs.
scheme including:
• Council completed the Six Mile Creek Flood
• Agriculture & Agricultural Land in Noosa Shire; Study after extensive consultation with the Lake
• Biodiversity Assessment Report; Macdonald Drive Community Reference Group.
• Centres Hierarchy;
• Council began implementation of its Transport
• Extractive Resources & Minerals; Policy and Transport Strategy. We have begun
• Flood Management; to work with some local schools on Walk/Ride
• Housing Needs Assessment; to School programs. Extensive research has
• Landslip Hazard Report; also been undertaken on the other four priorities
identified in the Strategy including parking studies,
• Nature-based Tourism Review;
negotiations with Translink etc.
• Noosa Open Space Study;
• On-site Effluent Disposal; • Council provided a charging station for electric
• Urban Design Locality Summary Report; and vehicles at Cooroy as its contribution to the State
Government’s Electric Super Highway stretching
• Waterways Assessment Study.
from the Gold Coast to Cairns.
• Council was able to provide significant input into
the ongoing development of the draft South-East • Council adopted a Strategic Asset Management
Queensland Regional Plan. The Plan, which was Plan in September 2017. That Plan set the
adopted in August 2017, resulted in recognition framework for the adoption of more detailed Asset
of Noosa’s planning approach. There was no Management Plans. To date, detailed asset
expansion of the urban footprint which is a good management plans have been adopted for the
outcome for the Noosa community. Noosa Main Beach Sand Recycling System and
the Noosa Aquatic Centre.
• Council undertook a significant review of our
infrastructure plans to enable us to meet new • Council developed its first 5-year Capital Program
legislative requirements for the imposition of allowing for a longer planning horizon for capital
contributions from developers towards the cost of projects. Our Infrastructure Planning, Design
infrastructure. This included the adoption of a suite and Delivery team now have future projects they
of plans such as the Transport Network Plan as can plan for. In addition, our teams delivered a
required for the Local Government Infrastructure significant number of capital projects including:
Plan (LGIP). We were one of the first Councils • Weyba Road, Noosaville;
in Queensland to develop a LGIP under the new
legislation which was adopted by Council in May • Donnellys Road, Ridgewood;
2018. • Poinciana Avenue, Tewantin; and
• Major reseal program with 11.8 km of roads
• Council undertook a review of our Local Laws either resealed, rehabilitated or spray sealed.
and Subordinate Local Laws focusing particularly
• Council was successful in securing grant funding
on Local Law 1 (Administration) and Local Law 2
to replace a number of bridges including the Mary
(Animal Management). Council also established
River Road Bridge in Cooroy and the Noosa Road
a new Local Law (Local Law 7) dealing with waste
Bridge in Cooran. Tenders have been awarded
management on the basis that the State was
for these two bridges with the tender for the third
going to remove the legislative power on which
bridge at Orealla Crescent, Sunrise Beach to be
local governments regulated commercial waste
undertaken in 2018/19.
collection.
• Council adopted its Signage Policy in August
• Council adopted an updated Noosa Local Disaster
2017. This provides for a more uniform and
Management Plan that guides our responses to
consistent approach to Council signage noting the
natural disasters. Council has also undertaken
importance of the Noosa “look and feel” as set out
considerable work in developing our response to
in our Noosa Design Principles.
natural disasters including undertaking disaster
2017-2018 Annual Report | Page 13
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2017-18(PDF, 10MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.