Annual Report 2017-18
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Corporate Plan Theme 1: The Noosa Environment
“Our environment is protected and enhanced and is valued by the community”
• Council reviewed its management approach • Council successfully negotiated for the ongoing
to the Noosa River and has committed to processing and sale of our recyclable waste
refresh and rewrite the Noosa River Plan following the 2017 decision of the Chinese
with an expanded focus on river catchment government to discontinue taking Australian
management. Community consultation on the recyclable materials. At the same time, we have
revised Noosa River Plan is to be undertaken in responded to the announcement by the State
mid 2018 with the updated Plan expected to be government to introduce a $70 per tonne landfill
adopted by Council in late 2018. levy from early 2019.
• Council signed a Memorandum of • Council is continuing to develop a Climate
Understanding in October 2017 with the State Hazard Adaption Plan. This project (being
Government, HQPlantations and the Noosa funded by the State government via the Local
Parks Association for the development of a Government Association of Queensland) is
project to protect major parts of the Yurol and aiming to develop both a Climate Hazard
Ringtail forest areas. Council agreed to the Adaption Plan (CHAP) and a Climate Change
final format of the contracts in June 2018. This Adaption Plan. Research and community
is the most significant environmental project in engagement has been undertaken in 2017/18
recent years and will see almost 2,400 ha of for the CHAP.
land transition to protected conservation tenure
over the next 10 years providing regional scale • Council awarded tenders in September 2017
environmental connectivity, particularly for for the ongoing environmental monitoring of
koala corridors. Council owned landfills including both current
and closed landfills. This ensures that Council
• Council completed its audit of stormwater meets its environmental obligations in relation
pollution in the Noosaville Industrial Estate to its landfills (both current and closed).
and is working closely with local businesses to
improve environmental management practices • Council issued a new 7-year licence to operate
in that area. the Recycling and Sales Facility at the Eumundi
Road Resource Recovery Facility to Resource
• Council provided ongoing support to the Recovery Australia. This decision saw the
Boomerang Alliance in their campaign for a closure of the Brightside Tip Shop and the
Plastic Free Noosa. launch of Noosa Reviva in July 2018.
• Council is implementing its Zero Emissions • Council approved a further 3-year funding
Strategy focused on eliminating our agreement with the Noosa Biosphere Reserve
organisation’s emissions by 2026. Council Foundation in June 2018. During 2017/18,
considered a report by ERM Energy in relation Council also provided $250,000 to the Noosa
to the energy use of nine of Council’s largest Biosphere Reserve Foundation for projects that
energy producing sites. Contracts were let advance the purpose of the Noosa Biosphere
for the installation of solar panels at most Reserve as well as $140,000 for operational
of the major Council buildings at a cost of expenses (in accordance with the funding
approximately $250,000. This will reduce both agreement that was in place until 30 June
Council’s emissions and also our ongoing 2018).
electricity costs.
• Council has addressed a range of significant
• Council’s new waste management contract planning and environment applications during
commenced in September 2017. This new the last 12 months. During that period, Council
contract (awarded to Cleanaway for the approved 98.5% of planning applications.
period 2017 - 2024 at an approximate cost
of $46 million) is the largest contract Council • Council adopted a policy to oppose any further
manages. The introduction of a mandated applications for coal exploration, coal mining,
green waste recycling bin in urban areas coal seam gas exploration or coal seam gas
of the Shire (which will reduce green waste production within the Shire.
being buried in the landfill and significantly
reduce methane gas production) was a smooth
process with significant communication with our
community to ensure that service delivery was
seamless.
2017-2018 Annual Report | Page 9
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2017-18(PDF, 10MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.