Original source · versioned page text
2018-07-16 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 JULY 2018
Cooran Old Noosa Road Bridge replacement
Sunrise Beach Orealla Crescent Bridge refurbishment (design only)
Noosaville Noosaville Library refurbishment
Cooroy Hinterland Playground – Planning Stage
Noosaville - Library Refurbishment
Cooroy – Hinterland Playground (Planning Stage)
The above projects will continue to be delivered throughout the 2018/19 financial year with the
Tewantin - Hilton Tce upgrade and the Cooroy - Hinterland Playground projects to continue
through the 2019/20 financial year as well.
Page 7 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.