07/1172 - MCU - New Dwelling [As Published] · 132007.1172

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

n

INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidat areas refer to Guide 24.

Unless you answered ‘none of the above’ to Q9,

the application requires.assessment by. the
Environmental Protection Agency (EPA).

lan agency other than EPAis the assessment
manager for-the-application; EPA.is a.
concurrence agency for the application in
relation to this matter: . - :

  

Local government is the‘assessment manager: °

        
  
 

+ for all prescribed ti

 

 

 

IDAS Assessment Checklist, Version 20, 2 Aprit 200
8. The application involves operational work that is: ( tick the applicable boxes) ,

(Ci (i) tidal work’® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1: of

C1 (i) tidal work that is prescribed tidal work'' other than in a canal’ ~complate Part P of Form 4;
or
OO {iii) carried out within a coastal management district under the Coastal Act and for — complete

Part M of Form 1 if any box/es (a} to (i) below are ticked.

(3 (a) constructing or installing works in a watercourse between MHWS and HAT (is.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal intended to be connected ‘0 tidal waters:
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
LJ {h) removing or interfering with coastal dunes on land; other than State coastal land
that is in an erosion prone ‘area-and above high-water mark;
(Aq) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark: or ,
iv) none of the above.

Ci (b)
Oe)
O@
Ore)
OM
Oe

  

Aor RC EN paren

10. The application involves operational work that is: ( tick the appicable boxes)

(i) tidal work'? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Past M of Form 1; of

1 (ii) tidal work that is prescribed tidal work'4 > complete Part P of Form 1; OF
C1 fill) carried out within a coastal management district'5 under the Coastal Act arid for -
[1(a) disposing of dredge spoil or other solid waste material in tidal water — complete Part

Mof Form 1;
C1 (b) reclaiming tand under tidal water ~ complete Part M of Form 1; Of
Oe

constructing a canal, if the canal is associated with reconfiguring a lot ~ complete
Part M of Form 1; : .
[Xl (iv) none of the above,

 

11. The application involves: (tick the applicable boxes)

C(iy a materia! change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district

CI (ii) a material change of use assessable under a planning scheme involving building

work, carried out completely or partly in'a coastal management district that is -

+ the construction of a new premises with a GFA of at least 1000m?

+ the enlargement of the GFA of existing premises by more than 1000m?

reconfiguring a lot assessable.under schedule 8 of the IPA where the land is situated

completely or partly in a coastal management district

reconfiguring a lot" assessable under schedule 8 of the IPA and in connection with

the construction of a canal - complete Part M of Form 4

none of the above

Diiiy
Ow
wy,

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management teguiation 2003 and Includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA,

14 Prescribed tidal work Is defined in the Coastaf Protection and ‘Management Reguiation 2003 and includes certain tidal works completely or partly within a local government tidal area.

15 Coastal management district is defined In sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an araa declared as a
coastal management district under section 47(2) of that Act. .

16 GFA fs defined in sch 14 of the IPA lo mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application Is Deing assessed.

1? Under $117 of the Coastal Protection and’ Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the arlifcial waterway. ,

Page 4

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1172 - MCU - New Dwelling [As Published].pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.