Council archive · source document
07/1172 - MCU - New Dwelling [As Published] · 132007.1172
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24,
Ifyou answered ves to Q12, the application
triggers referral to the Port Authority,
The Port Authority is a concurrence agency ifthe
developmentis-
© ‘within 200m of a stippeg channel or an entry
and exit shipping corridor for the port
© within 1000m ofa swing basin, a commercial
* shipping wharf, a moori
“grounds;
IDAS Assessment Checklist, Version 20, 2 April 2007
42. Does the application involve development below high water mark18 and within the limits of a port
under the Transport Infrastructure Act 1994?
Kino
(C1 YES - complete Part M of Form 1, or Part P of Form 1 ifthe work is prescribed tidal work
prone seated
a Does the application involve operational v work that is tidal work for a marina with more than 6
* vessel berths?.
TRNO
O YES - ~ complete Part M.of Form 1, or Part P of Form 1 ifthe tidal work is mescrbed tidal work
2s yen: enna sat aces: wortascoer onmupenonnennsco enerenne,
16. Does the cpplcaon involve development ina ahtage registered olace as defined under the
14. Does the application involve tidal works within a strategic port land tidal area20?
pane
YES - comptete Part M of Form 1
Queensland Heritage Act 1992?
[xT NO
(2 YES - comptete Part € of Form 1
15(b)The application involves: (tick applicable boxes)
(i). amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992,
LC (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
., registered place under the Queensland Heritage Act 1992;
[XJ (iii) none of the above.
Declared: catchment areas
For more information,’ including alist of the o
daclared catchment areas ‘within, Queensland,
refer to Guide 13.
Unless you answered ‘none. of the above" to
.016, the application requires assessment by the
Department of Natural Resourobe anid Water’
(NRW).
Ifan agency other than NRW is | the assessment
manager for the application, NRWisa
concurrenca agency for the application i in
relation to this malter.
16. The application i isin an area declared to be a catchment area under the Waler Act 2000 and
involves: (tick the applicable box/es)
C1 (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Ci) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
‘Kel(it) none of the above
18 High water mark Is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995.
20 Strategic port land tidal areas are the araas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1172 - MCU - New Dwelling [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.