CODE ASSESSMENTS
Earthworks Code
Earthworks Code
Performance outcomes Acceptable Outcomes Response
Managing contamination risk Complies
PO6 AO6.1
Materials used as fill are suitable for Fill material is solid clean earth, free of putrescible
development and future use of the land and or refuse material, vegetation, acid sulfate
filling or excavation works do not result in the soils, building or construction material or other
contamination of land. material or contaminants.
AO6.2 Complies
The site is not on the contaminated land register.
Haulage activity and amenity Complies
PO7
Haulage of material to and from No acceptable outcome provided
a site ensures—
1. minimal disturbance to
neighbouring properties and
properties along the haulage
route; and
2. Council’s road infrastructure
including pavements is not
adversely affected.
Extent of earthworks Complies
PO8 AO8
The layout of the development provides All earthworks, including cut and fill batters,
adequate, clearly defined and easily retaining walls and the like are contained within the
accessible— subject site.
1. on-site vehicle parking and
manoeuvring areas; and
2. loading and manoeuvring areas
for delivery and service vehicles.
Page | 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Code Assessments.pdfRelated documentApplication case desk ↗
About this file
- File size
- 886 KB (small file)
- File type
No other editions are linked here.