Council archive · source document
Code Assessments · MCU21/0015
CODE ASSESSMENTS
Earthworks Code
Earthworks Code
Performance outcomes Acceptable Outcomes Response
Sloping sites Complies
PO9 AO9
On sloping sites development follows the Cut or fill is less than 1.5 metres in depth relative to
natural landform wherever practical and the natural ground level.
excavation or filling is minimal.
Infrastructure protection Complies
PO10 No acceptable outcome provided
Earthworks and vehicular access do not
adversely impact on the capacity,
operations and maintenance of existing
infrastructure.
Environmental protection Complies
PO11 No acceptable outcome provided
Earthworks minimise any adverse impact upon
groundwater, watercourses, drainage lines,
wetlands, and native vegetation.
Dams N/A
PO12 AO12.1
Dam location and construction does not impact Where the site is in the Rural zone—
upon neighbouring properties or road
reserves, in terms of— 1. the land has a slope of less than 25%
(1:4);
1. hydrology; 2. the earthworks including cut and fill
2. alteration of existing overland batters and retaining walls
flow paths and patterns; are setback a minimum of 50 metres
3. landslide or failure of dam wall; from the property boundary; and
and 3. the size of the lot is greater than 5
hectares.
Page | 60
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Code Assessments.pdfRelated documentApplication case desk ↗
About this file
- File size
- 886 KB (small file)
- File type
No other editions are linked here.