Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Viridian III Technical Specification OPW1 [As Published] · 142008.256

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                       VIRIDIAN III - Landscape Works


1.     PRELIMINARIES


1.1    SCOPE OF WORK
To be co-ordinated by Builder.


1.2    EXCLUDED WORKS
To be co-ordinated by Builder.


1.3    DEFINITIONS

The terms ‘directed’, ‘selected’, ‘required’ and ‘approved’ mean directed, selected, required
and approved by the Builder unless expressly specified otherwise.

Unless the contract otherwise requires, the following definitions apply:

              Head Contract:     “Head contract” shall mean contract to which the contractor is
                                 nominated as subcontractor.
              Supply:             “Supply”, “furnish” and similar expressions mean “supply
                                 only”.
              Provide:            “Provide” and similar expressions mean “supply and install”.
              Approved:           “Approved”, “reviewed”, “directed”, “endorsed” and similar
                                 expressions mean “approved (reviewed, directed, rejected,
                                 endorsed) in writing by the contract administrator.”
              Give Notice:        “Give notice”, “submit”, “advise”, “inform” and similar
                                 expressions mean “give notice (submit, advise, inform) in
                                 writing to the contract administrator”.
              Proprietary:        “Proprietary” means identifiable by naming manufacturer,
                                 supplier, installer, trade name, brand name, and catalogue or
                                 reference number.
              Samples:           Includes samples, prototypes and sample panels.
              NATA:              National Association of Testing Authorities.

1.4    SITE MEETINGS

Site meetings will be held as determined by builder
      Location:                    To be agreed between all parties
      Time:                        To be agreed between all parties
      Chairperson:                 Builder
      Meeting Minutes taken        Builder
      by:
      Distribution of Minutes:     Builder

1.5    CONSTRUCTION OF WORKS

Works will be performed in accordance with the site management plan provided by the Head
contractor.




EDAW Aust                             Page 4                        February 2008

Used in these records

About this file

File size
133 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Viridian III Technical Specification OPW1 [As Published].pdf · 133 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.