Viridian III Technical Specification OPW1 [As Published] · 142008.256
VIRIDIAN III - Landscape Works 15. MAINTENANCE 15.1 HARD AND SOFTSCAPE ESTABLISHMENT PERIOD The work contained in this section comprises the establishment maintenance and defects liability of all works executed under this contract. Maintain the contract areas for a period of 26 weeks after the date of Practical Completion. Maintenance of the works prior to the date of Practical Completion shall not be included in this period. Complete maintenance works schedules and submit to the Builder as a record of the maintenance activities. Promptly make good any defects or damage resulting from defective construction, materials or workmanship to the complete satisfaction of the Builder during this period. In the event of any failure to rectify defective work the Builder may instruct that the work be carried out by another company, the cost of which will be charged to the Contractor. 15.1.1 WATERING Implement an appropriate hand watering regime to supplement the irrigation (off tank) system if required, or in times when the irrigation system is being maintained or has failed. The Contractor shall monitor the irrigation system as an integral part of the maintenance program. Frequency: Weekly or as required. 15.1.2 WEEDING During the Contract period remove weed growth that occurs throughout all contract areas. This shall be executed regularly so that at weekly intervals (at least) the landscape contract areas may be observed in a completely clean and tidy condition, free from rubbish and weeds. 15.1.3 PLANT / TREE REPLACEMENT Immediately replace plants / trees that die or fail to thrive, are damaged or stolen, with plants of the same species and of similar size and quality, unless otherwise specified. Replacement plant material shall have the maintenance period extended in accordance with the Contract conditions. Frequency: as required 15.1.4 STAKES AND GUYS Adjust and/or replace stakes and ties where required. Remove staking and guying when instructed by the Builder Frequency: monthly EDAW Aust Page 44 February 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian III Technical Specification OPW1 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 133 KB (small file)
- File type
No other editions are linked here.