                                                                         VIRIDIAN III - Landscape Works


SAMPLE SCHEDULE
Specimen or Item:                                                        Quantity:
Imported topsoil mixes / additives                                       1kg ea
Organic Mulch – 1’ hoop pine as specified                                1kg
Inorganic Mulch                                                          1kg
Yellow Stone Wall Facing Wall type W1 (refer wall type schedule)         1m2
Blockwork Wall type W2 (refer wall type schedule)                        1m2
All paving and concrete finishes (refer paving type schedule)            2m2
Plant stock                                                              images
All Pool Coping                                                          2 linear m
All Pool Surfacing                                                       2m2



1.15   ENVIRONMENTAL PROTECTION

Refer to EMP: Viridian Noosa Stage 3, Issue: 1 by Chenoweth EPLA               Revision: 1
2/11/2008.


1.16   PLANT ESTABLISHMENT

The Plant Establishment Period is the time subsequent to Practical Completion during which
the Contractor has specific responsibilities for the maintenance of the plant material. Specific
responsibilities are outlined in the Specification and Maintenance Manual.
The Plant Establishment Period is twenty-six (26) weeks from the Date of Practical
Completion.
At the end of the Plant Establishment Period, all plant material shall be in good health and
have grown at a rate deemed acceptable by the Landscape Architect. They shall be capable
of growth independent of all temporary works.

During Maintenance Period
Any plant material that shows signs of stress or decline during the Plant Establishment
Period will be inspected by the Landscape Architect. If in the opinion of the Landscape
Architect the plant is stressed, failed or deteriorating, the Contractor is required to replace
that plant immediately with the same species and of an equivalent size to that of the
specified plant size in the contract and equivalent to normal growth rate prior to its removal.

Completion of Maintenance Period
At the end of the Plant Establishment Period, any plant material which has not shown
significant signs of growth, failed, deteriorated, or in the opinion of the Landscape Architect
requires replacement shall be replaced immediately by the Contractor, at the Contractor’s
expense. Plant material to be replaced is to be of the same species and of an equivalent
size to that of the specified plant size in the contract after twenty-six (26) weeks of
successful establishment. This size will be determined ICC if required.
The Council representative charged with assessing plant material shall be a suitably
qualified horticulturist.

1.17   IRRIGATION

The irrigation requirements as specified by the sub-consultant include the supply and
installation of temporary irrigation to all new landscape areas as outlined in the irrigation
specification.



EDAW Aust                              Page 7                         February 2008

Used in these records

About this file

File size
133 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Viridian III Technical Specification OPW1 [As Published].pdf · 133 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.