Council archive · source document
Viridian III Technical Specification OPW1 [As Published] · 142008.256
VIRIDIAN III - Landscape Works applications for substitution is made as soon as it is known that specified materials are unavailable. The Landscape Architect shall approve substitutions if he/she are satisfied that the proposed substitute is satisfactory for the purpose intended. Unless otherwise specified, manufactured items to be used in the work under the contract are to be used in accordance with current recommendations published by the manufacturer. Workmanship shall be the best of its respective kind and conform to the best practices of the trade. Only suitably qualified persons shall perform work on this project relevant to their area of expertise. 1.12 INSPECTION If notice of inspection is to be given in respect of parts of the works, advise if and when those parts are to be concealed. Do not conceal those parts unless approved in writing by the Builder. Minimum of 24 (twenty-four) hours notice for inspections to be made. 1.13 TESTING Testing to be in accordance with EMP: Viridian Noosa Stage 3, Issue: 1 by Chenoweth EPLA Revision: 1 2/11/2008. 1.14 SAMPLES Submit representative samples of the plants and other materials and products specified in the SAMPLE SCHEDULE. Submit a plant sample of each species for inspection and approval in the condition in which it is proposed to supply it to the site. Replace, at no additional cost, plant samples rejected as unsuitable for used, including samples rendered unsuitable by the process of examination (e.g. for root condition), samples not rejected may be included in plant material for use in the works. Coordinate submissions of related sample compliance information. Delays caused by late submissions or submitting inadequate sample compliance information will not be grounds for extensions of time. Contractor to submit four (4) copies of sample compliance information only. No samples of materials are to be supplied unless requested by the Builder. Identify the project, Contractor, subcontractor or supplier, manufacturer, applicable product, model number and options, as appropriate and include pertinent contract documentation references. Include service connection requirements and product certification. Identify non- compliances with product requirements, and characteristics that may be detrimental to successful performance of the completed work. Do not commence work affected by samples until the sample compliance information has been approved. Submit further sample compliance information as requested by the Builder. Keep samples in good condition on site, until practical completion. Samples are to be available for inspection if requested by the Builder at any time. EDAW Aust Page 6 February 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian III Technical Specification OPW1 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 133 KB (small file)
- File type
No other editions are linked here.