                                                                       VIRIDIAN III - Landscape Works
applications for substitution is made as soon as it is known that specified materials are
unavailable. The Landscape Architect shall approve substitutions if he/she are satisfied that
the proposed substitute is satisfactory for the purpose intended.
Unless otherwise specified, manufactured items to be used in the work under the contract
are to be used in accordance with current recommendations published by the manufacturer.
Workmanship shall be the best of its respective kind and conform to the best practices of the
trade. Only suitably qualified persons shall perform work on this project relevant to their area
of expertise.


1.12   INSPECTION

If notice of inspection is to be given in respect of parts of the works, advise if and when
those parts are to be concealed. Do not conceal those parts unless approved in writing by
the Builder.
Minimum of 24 (twenty-four) hours notice for inspections to be made.

1.13   TESTING
Testing to be in accordance with EMP: Viridian Noosa Stage 3, Issue: 1 by Chenoweth
EPLA Revision: 1 2/11/2008.

1.14   SAMPLES
Submit representative samples of the plants and other materials and products specified in
the SAMPLE SCHEDULE.

Submit a plant sample of each species for inspection and approval in the condition in which
it is proposed to supply it to the site. Replace, at no additional cost, plant samples rejected
as unsuitable for used, including samples rendered unsuitable by the process of examination
(e.g. for root condition), samples not rejected may be included in plant material for use in the
works.

Coordinate submissions of related sample compliance information. Delays caused by late
submissions or submitting inadequate sample compliance information will not be grounds for
extensions of time.

Contractor to submit four (4) copies of sample compliance information only. No samples of
materials are to be supplied unless requested by the Builder.

Identify the project, Contractor, subcontractor or supplier, manufacturer, applicable product,
model number and options, as appropriate and include pertinent contract documentation
references. Include service connection requirements and product certification. Identify non-
compliances with product requirements, and characteristics that may be detrimental to
successful performance of the completed work.

Do not commence work affected by samples until the sample compliance information has
been approved. Submit further sample compliance information as requested by the Builder.

Keep samples in good condition on site, until practical completion. Samples are to be
available for inspection if requested by the Builder at any time.




EDAW Aust                             Page 6                         February 2008

Used in these records

About this file

File size
133 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Viridian III Technical Specification OPW1 [As Published].pdf · 133 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.