3.6 DOUGLAS LANE ROAD FLOW CALCULATION
A road flow capacity assessment has been undertaken to confirm that the external flows on Douglas
Lane do not enter the site.
3.6.1 PEAK FLOW CALCULATION
Refer to Figure 6 for the external catchment delineation and Table 12 for peak flow rates calculated
using the Rational Method. Refer to Appendix B for additional details.
External
Catchment
0.13ha
Manning’s
Section
Figure 6 – External Catchment to Douglas Lane
Table 12 – External Catchment Peak Flows
Scenario 63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Current Peak
0.030 0.040 0.055 0.068 0.081 0.103 0.113
Flow (m³/s)
2100 Peak
0.036 0.048 0.066 0.081 0.097 0.123 0.136
Flow (m³/s)
3.6.2 ROAD CAPACITY CALCULATION
The Manning’s Equation has been used to undertake a road flow calculation on Douglas Lane. Refer to
Figure 6 above for the cross-section location. The longitudinal grade on Douglas Lane fronting the site is
approximately 8% and a surface roughness value of 0.015 was adopted for the pavement.
The results in Table 13 show the flows do not overtop the kerb, which is approximately 120mm high.
Refer to Appendix B for further calculation details.
Table 13 – Manning’s Equation Calculation
1% AEP Flow Max Road Flow
Scenario Velocity (m/s) DV Product (m²/s)
(m³/s) Depth (mm)
Current Peak
0.113 42 1.54 0.07
Flow (m³/s)
2100 Peak
0.136 45 1.65 0.07
Flow (m³/s)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.