Council archive · source document
JFP SBSMP Revision C · OPW24/0103
Table 10 – Pre & Post-Development Peak Flows (XP-STORM)
Peak Flow Results (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Post-Dev.
(2100 rainfall 0.011 0.014 0.016 0.018 0.020 0.022 0.024
intensities)
Pre-Dev.
(current rainfall 0.012 0.017 0.021 0.027 0.032 0.034 0.038
intensities)
Variance -0.001 -0.003 -0.005 -0.009 -0.012 -0.012 -0.0013
The above results demonstrate that the post-development peak flow with a 20% increase in rainfall
intensities are mitigated against the pre-development peak flows currently and in the year 2100.
Moreover, the 1% AEP post-development flow does not exceed 25L/s (0.025m³/s).
3.5.6 DETENTION TANK RESULTS
Table 11 presents the detention tank performance. As can be seen, the 1% AEP is within the tank volume
of 20.4m³.
Table 11 – Detention Tank Results
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Tank Inflow
0.021 0.026 0.032 0.037 0.041 0.042 0.044
(m³/s)
Tank Outflow
0.012 0.014 0.016 0.018 0.020 0.022 0.024
(m³/s)
Detention
6.2 8.2 10.5 12.9 15.2 17.4 19.7
Volume (m³)
Depth of
0.73 0.97 1.24 1.51 1.78 2.05 2.32
Water (m)
Water RL
30.83 31.07 31.34 31.61 31.88 32.15 32.42
(m AHD)
Note: Invert of detention tank is 30.10m AHD
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.