RATIONAL METHOD CALCULATION – SITE
 Catchment Details                      EXISTING SITE PROPOSED SITE

 Area (ha)                                 0.0486        0.0486
 Impervious Area (ha)                      0.0277        0.044
 Fraction Impervious (%)                    57%           92%
 1
  I60 (mm/hr)                              75.2           75.2
 C1                                        0.656          0.70
 C2                                        0.70           0.75
 C5                                        0.78           0.84
 C10                                       0.82           0.88
 C20                                       0.86           0.92
 C50                                       0.94           1.00
 C100                                      0.98           1.00




 Time of Concentration (min)
                                          Method                                      Tc
        Catchment
       EXISTING SITE        Standard inlet time, catchment slope ~14%                 8
      PROPOSED SITE         Standard inlet time, mostly paved/impervious areas        5




 Rainfall Intensities (mm/hr)
         Catchment            1yr ARI     2yr ARI   5yr ARI      10yr ARI 20yr ARI 50yr ARI 100yr ARI
       EXISTING SITE            111         139       168          196      223      257       282
      PROPOSED SITE             125         158       193          227      259      301       333




 Stormwater Quantities (m3/s)
        Catchment           1yr ARI       2yr ARI   5yr ARI      10yr ARI 20yr ARI 50yr ARI 100yr ARI
       EXISTING SITE          0.010        0.013     0.018        0.022    0.026    0.033     0.037
      PROPOSED SITE           0.012        0.016     0.022        0.027    0.032    0.041     0.045




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                                            36 & 38 DUKE STREET, SUNSHINE BEACH

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

JFP SBSMP Revision C.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.