RATIONAL METHOD CALCULATION – EXTERNAL
CATCHMENT (DOUGLAS LANE)
Catchment Detals
External
Catchment
Area (ha) 0.1302
Impervious Area (ha) 0.1042
Fraction Impervious (%) 80%
1
I60 (mm/hr) 75.2
C1 0.70
C2 0.74
C5 0.83
C10 0.87
C20 0.91
C50 1.00
C100 1.00
Time of Concentration (min)
Catchment Method Tc
External Catchment Standard inlet time, mostly paved/impervious areas 6
Rainfall Intensities (mm/hr)
Scenario 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Current 120.0 151.0 184.0 215.0 245.0 284.0 313.0
2100 144.0 181.2 220.8 258.0 294.0 340.8 375.6
Stormwater Quantities (m3/s)
Scenario 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Current 0.030 0.040 0.055 0.068 0.081 0.103 0.113
2100 0.039 0.048 0.066 0.081 0.097 0.123 0.136
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.