Council archive · source document
JFP SBSMP Revision C · OPW24/0103
MANNING’S CALCULATION – DOUGLAS LANE
Cross Section Details 1% AEP Flow (current rainfall) 1% AEP Flow (2100 rainfall)
Point CH Z n wA wP n x wA wA wP n x wA
1 0.00 0.080 0.015
2 0.00 0.000 0.015 0.00 0.04 0.00 0.00 0.04 0.00
3 0.50 0.012 0.015 0.02 0.50 0.00 0.02 0.50 0.00
4 1.31 0.027 0.015 0.02 0.80 0.00 0.02 0.80 0.00
5 2.06 0.021 0.015 0.01 0.75 0.00 0.02 0.75 0.00
6 2.61 0.018 0.015 0.01 0.56 0.00 0.01 0.56 0.00
7 2.88 0.017 0.015 0.01 0.26 0.00 0.01 0.26 0.00
8 3.50 0.073 0.015 0.00 0.29 0.00
9 4.67 0.089 0.015 0.01 0.69 0.00
wA wP n x wA wA wP n x wA
TOTAL 0.073 3.207 0.001 0.086 3.618 0.001
Slope (m/m)
0.08 R n Q R n Q
0.023 0.015 0.113 0.024 0.015 0.136
Design Flow (m³/s) 0.113 0.136
WSL (m) 0.042 0.045
Results
Channel Flow (m³/s) 0.113 0.14
Velocity (m/s) 1.54 1.58
Max. Depth (m) 0.042 0.04
DV Product (m²/s) 0.07 0.07
0.10
0.09
0.08
0.07
0.06
0.05 Surface
0.04 1% AEP Flow (current
rainfall)
0.03
1% AEP Flow (2100
0.02 rainfall)
0.01
0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Chainage (m)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.