Skip to the record
Accept no substitutions.

Council archive · source document

JFP SBSMP Revision C · OPW24/0103

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

          INTRODUCTION
JFP Urban Consultants Pty Ltd has been commissioned by Cambooya Pty Ltd to compile this Site Based
Stormwater Management Plan (“SBSMP”) for the proposed development at 36 & 38 Duke Street,
Sunshine Beach (“site”). The material change of use approval is MCU23/0070. The operational works
application reference is OPW24/0103.

The site currently contains a restaurant located fronting Duke Street. It is understood that the proposal
is for a mixed-use development comprising the existing tenancy fronting Duke Street and five residential
apartments developed above. Refer to Appendix A for the survey of the existing site and for an extract
of the approved development plans.

This revision (Revision C) provides responses to Council Information Request associated with
OPW24/0103 dated 12th August 2024. Refer to Section 1.2.


1.1      OBJECTIVE & SCOPE
The design objectives for this report are:
     Nominate the lawful point of discharge.
     Ensure post-development peak flow rates are mitigated back to the pre-development peak flow
      rates via onsite detention.
     Confirm if the Water Quality Objectives (WQOs) in accordance with the State Planning Policy (2017)
      is applicable for the site.

The scope of investigations undertaken for this report is as follows:
     Nominate lawful point of discharge.
     Undertake hydrological and hydraulic analysis for the site using the XP-STORM 1D. This analysis
      includes the sizing of onsite detention to achieve peak flow mitigation.
     Provide commentary regarding possible performance-based stormwater quality management
      strategies for the operational phase of the development.


1.2      OPW INFORMATION REQUEST ITEMS
Issue – Increase in Rainfall Intensity
It is unclear if the management of stormwater, particularly available detention volume, has been
designed to allow for a 20% increase in rainfall intensity by the year 2100 in accordance with
Performance Outcome 2 of The Noosa Plan 2020 – Water Quality and Drainage Code.

Information Required
    1. Provide additional detail demonstrating that a 20% increase in rainfall intensity has been
       incorporated into the sizing of the proposed detention tank (i.e., detention volume). The
       additional detail must be certified by a suitably qualified person (RPEQ).

RESPONSE:
The detention tank design has been revised to allow for a 20% increase in rainfall intensity by the year
2100. Refer to Section 3.5.


SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                       36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |1

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

JFP SBSMP Revision C.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.