Council archive · source document
JFP SBSMP Revision C · OPW24/0103
INTRODUCTION JFP Urban Consultants Pty Ltd has been commissioned by Cambooya Pty Ltd to compile this Site Based Stormwater Management Plan (“SBSMP”) for the proposed development at 36 & 38 Duke Street, Sunshine Beach (“site”). The material change of use approval is MCU23/0070. The operational works application reference is OPW24/0103. The site currently contains a restaurant located fronting Duke Street. It is understood that the proposal is for a mixed-use development comprising the existing tenancy fronting Duke Street and five residential apartments developed above. Refer to Appendix A for the survey of the existing site and for an extract of the approved development plans. This revision (Revision C) provides responses to Council Information Request associated with OPW24/0103 dated 12th August 2024. Refer to Section 1.2. 1.1 OBJECTIVE & SCOPE The design objectives for this report are: Nominate the lawful point of discharge. Ensure post-development peak flow rates are mitigated back to the pre-development peak flow rates via onsite detention. Confirm if the Water Quality Objectives (WQOs) in accordance with the State Planning Policy (2017) is applicable for the site. The scope of investigations undertaken for this report is as follows: Nominate lawful point of discharge. Undertake hydrological and hydraulic analysis for the site using the XP-STORM 1D. This analysis includes the sizing of onsite detention to achieve peak flow mitigation. Provide commentary regarding possible performance-based stormwater quality management strategies for the operational phase of the development. 1.2 OPW INFORMATION REQUEST ITEMS Issue – Increase in Rainfall Intensity It is unclear if the management of stormwater, particularly available detention volume, has been designed to allow for a 20% increase in rainfall intensity by the year 2100 in accordance with Performance Outcome 2 of The Noosa Plan 2020 – Water Quality and Drainage Code. Information Required 1. Provide additional detail demonstrating that a 20% increase in rainfall intensity has been incorporated into the sizing of the proposed detention tank (i.e., detention volume). The additional detail must be certified by a suitably qualified person (RPEQ). RESPONSE: The detention tank design has been revised to allow for a 20% increase in rainfall intensity by the year 2100. Refer to Section 3.5. SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH P a g e |1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.