Council archive · source document
JFP SBSMP Revision C · OPW24/0103
Issue – Inlet Connections to Detention Tank
Council has identified the following items of JFP’s Drainage Layout Plan (D02, Rev. A) that require further
clarification:
a. The outlet of the ‘grated inlet’ in the carpark is to be connected to the detention tank. It is
unclear how the connection into the detention tank is to be constructed.
b. A ‘45O bend’ is annotated downstream of structure 1/A, however a 90O right-hand bend is
shown. The hydraulic performance and future maintenance of a 90O righthand bend is of
concern.
C. Catchment D3 is to be directed to structure 3/A. It is unclear how this landscaped catchment
area on the Douglas Lane level is to be directed down to structure 3/A on the Duke Street level.
Information Required
2. Provide additional detail addressing the above concerns. The additional detail must be prepared
by a suitably qualified person (RPEQ), and include but not be limited to:
a. An amended detention tank detail and section detailing the inlet connection from
structure 1/A;
b. A comment by the certifying engineer clarifying that a 45O bend will be installed or that
a 90O right-hand bend is suitable (hydraulically, maintenance); and
C. Demonstrate how the Catchment D3 (landscaped area) will be directed between the
Douglas Lane and Duke Street levels.
RESPONSE:
a. A connection from the car park grated inlet (1/D) to detention tank is now shown operational
works drawing no. M3024E-D02, Rev B (not attached to this report). The grated inlet 1/D is
located on Douglas Lane level at RL 33.86 while the detention tank is located on Duke Street level
and tank IL is 30.10m AHD. Additional details are to be provided the building hydraulic
consultant.
b. The design plans have been amended to show two 45-degree bends.
c. Flows from Catchment D3 are to flow to inlet 3/A via piped drainage constructed within building
works. Design of this piped drainage forms part of building hydraulic works. Catchment D3 is the
landscaped planter area situated on Douglas Lane level at RL 33.86 while structure 3/A is on
Duke Street level at RL 30.26m AHD. an upper-level outdoor area. Relevant notes have been
added to operational works drawing no. M3024E-D01, Rev B (not attached to this report).
SITE BASED STORMWATER MANAGEMENT PLAN – Revision C 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
JFP SBSMP Revision C.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.