Issue – Inlet Connections to Detention Tank
Council has identified the following items of JFP’s Drainage Layout Plan (D02, Rev. A) that require further
clarification:
     a. The outlet of the ‘grated inlet’ in the carpark is to be connected to the detention tank. It is
          unclear how the connection into the detention tank is to be constructed.
     b. A ‘45O bend’ is annotated downstream of structure 1/A, however a 90O right-hand bend is
          shown. The hydraulic performance and future maintenance of a 90O righthand bend is of
          concern.
     C. Catchment D3 is to be directed to structure 3/A. It is unclear how this landscaped catchment
          area on the Douglas Lane level is to be directed down to structure 3/A on the Duke Street level.

Information Required
    2. Provide additional detail addressing the above concerns. The additional detail must be prepared
       by a suitably qualified person (RPEQ), and include but not be limited to:
            a. An amended detention tank detail and section detailing the inlet connection from
                structure 1/A;
            b. A comment by the certifying engineer clarifying that a 45O bend will be installed or that
                a 90O right-hand bend is suitable (hydraulically, maintenance); and
            C. Demonstrate how the Catchment D3 (landscaped area) will be directed between the
                Douglas Lane and Duke Street levels.
RESPONSE:
    a. A connection from the car park grated inlet (1/D) to detention tank is now shown operational
       works drawing no. M3024E-D02, Rev B (not attached to this report). The grated inlet 1/D is
       located on Douglas Lane level at RL 33.86 while the detention tank is located on Duke Street level
       and tank IL is 30.10m AHD. Additional details are to be provided the building hydraulic
       consultant.
    b. The design plans have been amended to show two 45-degree bends.
    c. Flows from Catchment D3 are to flow to inlet 3/A via piped drainage constructed within building
       works. Design of this piped drainage forms part of building hydraulic works. Catchment D3 is the
       landscaped planter area situated on Douglas Lane level at RL 33.86 while structure 3/A is on
       Duke Street level at RL 30.26m AHD. an upper-level outdoor area. Relevant notes have been
       added to operational works drawing no. M3024E-D01, Rev B (not attached to this report).




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                         36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |2

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

JFP SBSMP Revision C.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.