1.3       MCU INFORMATION REQUEST ITEMS
Issue – Stormwater Drainage
The submitted documentation does not include sufficient information for Council to assess how
stormwater generated by the development will be controlled, collected, and discharged.
 It is unclear what the proposed structure downstream from the proposed detention tank is and how
    it will integrate into the proposed drainage system (indicated by a blue circle).
 It is unclear how the proposed detention tank overflows during events up to, and including, a 1%
    AEP event (volume, discharge rate).
 It is unclear how the infiltration outlet of the detention tank will operate. Given the large catchment
    area of the detention tank, Council is concerned the soil may become oversaturated and the
    filtration rate of the soil will reduce which may adversely affect the overall drainage system and the
    structural elements of the development.
 It is unclear how the proposed field inlet in catchment D3 will function during a 1% AEP event.
    Council recognise that this field inlet serves both the overflow from the detention tank and a small
    catchment area. Council is concerned that during events up to, and including, a 1% AEP event this
    pit may surcharge and direct additional runoff on to the footpath in the road reserve.
 The discharge rate of the RHS kerb adapter is unclear. Council is unlikely to support a discharge rate
    higher than 25 l/s during a 1% AEP event.

Information Required
13. Provide additional detail to address Council’s concerns. The additional detail must be prepared by a
suitably qualified person (RPEQ).
Note that the detail can be preliminary in nature but must be sufficiently detailed to demonstrate that
the stormwater system is conceptually functional.


RESPONSE:
The following responses are provided for each dot point raised:
     The ‘blue circle’ is a manhole/roofwater pit. It conceptually shows a junction at which drainage pipes
      change direction. The concept plans have been amended and further details can be provided during
      detailed design as required.
     The outflow from the tank is controlled via a 75mm diameter orifice. It limits 1% AEP site discharge
      to 25L/s as requested in dot point #5. An overflow weir is proposed at RL 33.11m AHD to allow
      overflow.
     No infiltration is proposed. All outflows are directed to Duke Street kerb and channel.
     Runoff from a majority of Catchment D3 will be collected by building’s roofwater system. The
      proposed field inlet in Catchment D3 has been amended to a roofwater pit and it can be provided
      with a bolt down cover so that it will not surcharge. The outflow pipe from the detention tank will
      operate under head. This is consistent with standard building hydraulic design.
     The discharge rate from site has been limited to 25L/s in a 1% AEP storm event. This has been
      achieved by increasing detention volume and limiting outflows via 75mm diameter orifice.
      Appropriate screens can be incorporated in detail design to minimise blockage of this orifice. Any
      additional requirements can be conditioned.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision C                          36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |3

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

JFP SBSMP Revision C.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.