Site Based Stormwater Management Plan
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4.3 Pre-Development Hydrology
Pre-development peak stormwater discharge was estimated using XPSTORM modelling
software, and compared against the results from the Rational Method. Table 4.2 presents
the comparison to validate the peak flows estimated using XPSTORM.
Peak Discharge Comparison (m3/sec)
Design Storm Rational Method XPSTORM Difference % Change
(AEP)
63% 0.089 0.088 -0.001 -1%
39% 0.114 0.118 0.004 4%
18% 0.158 0.163 0.005 3%
10% 0.198 0.191 -0.007 -4%
5% 0.236 0.221 -0.015 -6%
2% 0.301 0.275 -0.026 -9%
1% 0.346 0.306 -0.040 -12%
Table 4.2 Pre-Development Stormwater Flow Validation
From Table 4.2 the Rational Method results compare well with the XPSTORM model results
for estimates of the pre-developed peak stormwater discharging from the site.
To ensure a robust stormwater detention design the Rational Method results will be used to
represent the pre-developed peak stormwater discharge from the site.
Site Based Stormwater Management Plan Page 5 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.