Site Based Stormwater Management Plan

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.0 STORMWATER QUANTITY MANAGEMENT

4.1    Introduction

In accordance with the Noosa Plan (2020) stormwater flow discharging from the proposed
development is required to be consistent with the pre-development flow characteristics.
Peak flow rate was estimated using XPSTORM modelling software and validated using the
Rational Method in accordance with QUDM (2016).


A detention basin was proposed to address Acceptable Outcome AO2.3 of the Noosa Plan
(2020), which requires post-development stormwater flow discharge to be consistent with
pre-development characteristics. A 94.5m3 underground stormwater detention tank is
proposed and will mitigate post-development flow rates discharging from the site to be less
or equal to the pre-development case.




4.2    Hydrology

       4.2.1      Rational Method

Fraction impervious for the pre-development case was taken as 0.0 (Open space – QUDM
2016), and 0.95 (from architectural drawings) for the post-developed.


The Rational Method, IFD data was sourced from the Bureau of Meteorology, where the 1-
hour rainfall intensity (1I10) at Noosa for the 10% AEP = 74.2mm/h. The pre-developed
scenario C10 = 0.70 (fi = 0.00), and the post-developed scenario C10 = 0.89 (fi = 0.95).




       4.2.1      XPSTORM

The XPSTORM model for the pre-developed and post-developed cases were developed
using an iterative approach by varying the loss rates until the results compared with the
Rational Method (±20% - Model error).Table 4.1 presents the rainfall losses used in the
XPSTORM model.


        Catchment Area                        Initial Loss             Continuing Loss
               Pervious                           5 mm                    1 mm/hr
            Impervious                            0 mm                    0 mm/hr

                                           Table 4.1 Rainfall Losses




Site Based Stormwater Management Plan                                               Page 4 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
Log in to download the original file

Site Based Stormwater Management Plan.pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.