Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.7    Stormwater Detention Results

Table 4.7 presents the results from the XPSTORM detention basin model compared against
the pre-developed Rational Method results from Section 4.3.


                                    Peak Discharge Comparison (m3/sec)
                                                   Post-Developed
   Design Storm               Existing                                      Difference            % Change
                                                      Mitigated
       (AEP)

       63%                    0.089                     0.056                 -0.033               -37%
       39%                    0.114                     0.112                 -0.002                -2%
       18%                    0.158                     0.157                 -0.001                -1%
       10%                    0.198                     0.178                 -0.020               -10%
        5%                    0.236                     0.201                 -0.035               -15%
        2%                    0.301                     0.199                 -0.102               -34%
        1%                    0.346                     0.217                 -0.129               -37%
               Table 4.7 Pre-Development v Mitigated Post-Development Peak Stormwater Discharge



The detention basin outcome satisfies Acceptable Outcome AO2.3 from the Noosa Plan
(2020), by demonstrating post-development flow rate characteristics are equal to or less
than the pre-development case. This outcome ensures non-worsening of peak stormwater
flow discharging from the proposed development.




Site Based Stormwater Management Plan                                                             Page 9 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
Log in to download the original file

Site Based Stormwater Management Plan.pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.