Log in to see the plans as drawn4.8 Lawful Point of Discharge
The Lawful-Point of Discharge is the existing Council controlled open drain within the
drainage reserve south of the subject site, which complies with Section 3.9.1 i) of QUDM
(2017) for a Lawful Point of Discharge.
The subject site is already provided with an existing drainage outlet to the open drain, and
is shown in Figure 4.2 from Council’s Online Interactive mapping.
N
Subject Site
Existing drainage outlet Open Drain Drainage Reserve
Figure 4.2 Drainage Reserve Lawful Point of Discharge
Site Based Stormwater Management Plan Page 10 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.