Log in to see the plans as drawn5.0 STORMWATER QUALITY MANAGEMENT
In accordance with the Noosa Plan (2020) the site will be provided with stormwater quality
treatment to mitigate post-developed pollutants discharging from the site. A bioretention
basin is proposed for the development area sized in accordance with the deemed to comply
outcome specified in the SPP (2017), where the bioretention basin is 1.5% of the
contributing catchment being 5,508m2. The deemed to comply outcome satisfies P06 of the
Planning scheme, and will provide stormwater quality treatment sized in accordance with
the SPP (2017).
5.1 CONSTRUCTION PHASE
5.1.1 Pollutants
Typical pollutants generated during the construction phase of a development are listed in
Table 5.1 below.
Pollutant Potential Source Priority
Litter Paper, construction packaging, food packaging, High
cement bags, off cuts
Sediment Unprotected exposed soils and stockpiles during High
earthworks and building works
Hydrocarbons Fuel and oil spills, leaks from construction High
equipment and temporary car park areas.
Toxic Materials Cement slurry, asphalt primer, solvents, cleaning Medium
agents, wash waters (e.g. From tile works)
Alkaline Cement slurry and wash waters High
substances
Table 5.1 Typical Construction Phase Pollutants
5.1.2 Potential Impacts
Construction activities can have a potential impact on water quality. Removal of vegetation,
earthworks and changes to drainage patterns can result in erosion and sediment being
washed into waterways. This can impact on the physical-chemical parameters of the
receiving water, decline in the health of aquatic ecosystems, and overall aesthetics.
Potential impacts to the receiving waters surrounding the development site will be
minimized during the construction phase with typical measures as outlined below. These
measures should be adequately detailed on erosion and sediment control plans as part of
the development’s Operational Works application.
Site Based Stormwater Management Plan Page 11 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.