Site Based Stormwater Management Plan
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn1.0 INTRODUCTION
Barlow Shelley Consulting Engineers Pty Ltd was commissioned by HM Developments Pty
Ltd to prepare a Site Based Stormwater Management Plan (SBSMP). The plan relates to
the proposed Industrial development located on Lot 6 on SP197517 at 4 Taylor Court,
Cooroy, Queensland (Refer to Figure 1.1 – Locality map of the site).
Approximate development boundary.
Lot 6 SP197517
Figure 1.1.1 Locality Map of Site.
Site Based Stormwater Management Plan Page 1 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.