Site Based Stormwater Management Plan

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
2.0 SITE DESCRIPTION

The site is legally described as, Lot 6 on SP197517 at 4 Taylor Court, Cooroy, Queensland.
It is within the Local Government area of the Noosa Shire, adjacent the Bruce Highway. The
site is situated within the Nandroya Industrial Estate.


The site falls from north to south at a grade of 3% max with a bund formed from the southern
boundary to direct surface runoff towards the existing field inlet pit servicing the site at the
southwest corner. The Bruce highway is adjacent to the north and includes on and off ramps
associated with the Interchange. The lot includes a discharge pit to the southern grassed
swale drain at the southeast corner which services upstream catchments for lots 1,2 & 3
situated to the northeast boundary of the site. The site includes an existing sewer pumping
station and existing sewer easement to the northwest corner of the site.




                                                                                Subject Site
                         Existing Sewer Pump
                         and Sewer Easement




                                                                  Existing Grassed Swale       Existing Basin


                                  Figure 2.1 Aerial image of the Subject Site



The site has a total area of 0.57 ha and is the result of reconfiguration of lot 6 SP SP197517
into four individual lots.




Site Based Stormwater Management Plan                                                             Page 2 of 19
2123-SBSMP-01_Version 1.0 (October 2021)
Log in to download the original file

Site Based Stormwater Management Plan.pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.