GENERAL COMMITTEE MEETING AGENDA 13 NOVEMBER 2017
35. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version 1). A
copy of this document must be retained on the site together with the approved
Operational Works drawings for the stormwater quality treatment system and a
detailed life cycle costing of the system attached as an addendum. Records of all
maintenance activities undertaken must be kept and made available to Council upon
request.
36. Any proposed Community Management Statement required for the development
must include the Water by Design (2009) – Maintaining Vegetated Stormwater Assets
(Version 1) document and must include the full cost of maintaining the system in
accordance with that document.
37. The applicant must submit plans for approval with the operational works application
for the inclusion of educational signage or stencilling to be incorporated within the
development to ensure patrons are reminded to minimise waste and place it in bins.
Stormwater Harvesting
38. Operating underground stormwater harvesting tanks must be provided for the
development. The tanks must be provided in accordance with an Operational Works
approval and must include in particular:
a. a total tank capacity of a size suitable to maintain expected non-potable and
outdoor uses for a 2 month period without rain.
b. a minimum catchment of 50% of the building roof area.
c. re-use of harvested rainwater for internal non-potable uses and outdoor uses.
39. Certification must be submitted to Council from a qualified person which certifies that
the rainwater collection tank/s and associated reticulation has/have been installed in
accordance with the requirements of this Decision Notice.
Acid Sulfate Soils
40. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a suitably qualified
person and referenced in a Development Permit for Operational Works. The Acid
Sulfate Soil and Groundwater Management Plan submitted with the application for
Operational Works must detail:
a. Management necessary for the proposed filling to avoid any impacts of the
Potential Acid Sulfate Soils identified on the site – in particular impacts related
to compacting Acid Sulfate Soils into the groundwater table and releasing water
contaminants.
b. design measures necessary to prevent any oxidation of the potential acid
sulfate soils or transfer of acid sulfate soil leachates via dewatering of
groundwater through underground pipe bedding material.
c. Any other matters necessary to prevent the oxidation of potential acid sulfate
soils or release of Acid Sulfate Soil related water contaminants.
41. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a. a pH range of 6.5-8.5 pH units
a. 50mg/L maximum total suspended solids concentration
b. 0.3mg/L maximum total iron concentration
c. 0.2mg/L maximum total aluminium concentration
d. no visible plume at either the point of release from the site or within a waterway
Page 12 of 64
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.