Skip to the record
Accept no substitutions.

Original source · versioned page text

2017-11-13 General Committee Agenda

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 43 of 64

SCHEDULE 3 - Frontage Works Costings

      Tem                        DESCRIPTION                       a            a

                 Site establishment and disestablishment
                 including but not limited to, mandatory permits                                              On                 $5,000.00
                 and fees.

                  Provision of traffic management during
                joonatruction as approved by the Superiniendant                                      $10,000.00                $10,000.00
                 including all drawings, signs, barrens, warning
                 lights, sandbag kerbs etc

                 Stripping of topsoil and vegetation from all                                              $1.70                  $170.00
                 earthworks areas to stockpile on site for re-use.                                           .                         ’

                  Respreading of stockpiled topsoil to all                                                 $3.24                  $324.00
                 earthworks areas,                                                                                                     ’
     pO                                                                                                         88 00

                 Saw cut edge of Hilton Terrace bitumen and
                 removal of existing seal, pavement, kerb and                                                 an                 $5,035.80
                 channel and concrete invert channel including                                                .                    _——
                 refuse fees and charges.
                                                              To                                                wend
                  Removal of existing concerete pathway                                                $8,442.50                         ,
                 including refuse fees and charges.                                                      ’   .

    | a                                                       es es ee ee
                 Trim and compact road pavement subgrade to
                 300mm behind back of new kerb & chanmel to
                 new parking bays on Hilton Terrace

                 Supply, place and compact sub base (bottom
                 course) gravel - Type 2.3. Provisional
                 ‘Quantity.
     =                                                        Te                                                Ce
                 Supply, place and compact base (top course)
                 gravel - Type 2.1 Provisional Quantity.
[aaa __| 75mm thick (assumed CBR 5)                          Pome       fi                             Siemon

                 ‘Supply and install to Noosa Council Standard
                  Barrier Kerb & Channel including all materials.                                        $48.1                   $7,707.20
                 and work,

                                                                   17 of 21

                                                                                                                     Page 43 of 64
Log in to download the original file

2017-11-13 General Committee Agenda(PDF, 10MB).pdf · 10.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.