Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2017-11-13 General Committee Agenda

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 44 of 64

‘Supply and install to Noosa Council Standard
        5.2      ‘Concrete Invert Channel including all materials  m              63                     $76.00                 $4,080.4
                 and work.

                 ‘Construction of 100dia. sub surface stormwater
                 drain under Kerb including supply and laying of
                 crushed rock surround, sand, perforated pvc                                                 O0                         0
                 pipe and cleanout points complete, outlet
                 stormwater pit.
        a BP                                                So po                         So                                   " _—
    |S | Road Pavement Surfacing                              pe
                 ‘Supply, place and compact 30mm thick
                 Asphaltic

                 ‘Concrete (AC) surfacing to new carparking bays.
                 lon Hilton Terrace including preparation and
                 prime sealing under AC.
                eames    ~ —A—                                  ei pe psn                                                      _—
                 (Construction of 2.0m wide reinforced concrete

        74      Construction of 2.0m wide pedestrian pram                                             $1,178.16                         nl
                 ramps including all materials and work.
    oo                                                                                                                         tating
    | TEM                       DESCRIPTION                   punt | quantity fare | AMOUNT

                 ‘Construction of Stonmwater Drainage pipe
                 including supply, excavation, lay, sand bed and
                 backfill all pipes socketed, rubber ring jointed.
                 Provisional Quantity.
[ata _[a75 a RC. Pipes Clase 2                             Tm |                          |           saa               —_—istasinoo
                 ‘Supply and install precast concrete stormwater
                 quily pits complete including lintels, chambers,
                 all matenals and work. Provisional Quantity.

                 2.4m Lintel                                  a                                       $3,000.00] $3,000.00

                 ‘Supply and install new Class "D" stormwater
                 gully pit grates on existing stormnvwater pits.                                      $2,000.00)                $6,000.00
                 including all modifications, materials and work.

                                                                                                                8881.00

    |   9.1     Topsoll and Turt                                 a a                    ee
                                                                                                                2310.00
    P|                                                        |||
                 Removal and relocation of existing street signs                                                                $1,000.00
                 including new posts and concrete foundations.                                                                    ,   .

                                                                  18 of 21

                                                                                                                      Page 44 of 64
Log in to download the original file

2017-11-13 General Committee Agenda(PDF, 10MB).pdf · 10.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.