Our Ref: 20240911 Council Ref: MCU24/0153 and OPW24/0202 25 March 2025 Noosa Council PO Box 141 Tewantin QLD 4565 Via email: [email protected] Attention: Andrew Gaffney Dear Andrew, FURTHER ADVICE RESPONSE - DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE (MULTIPLE DWELLING - 6 UNITS) AND OPERATIONAL WORKS (ROADWORK, DRAINAGE WORK, STORMWATER, EARTHWORKS, CAR PARKING AND LANDSCAPING) AT 51 ELANDA STREET, SUNSHINE BEACH (LOT 403 RP48112) Further to Council’s Further Advice Request issued 10 January 2025, we now respond in full to each of the items raised. In support of this response, please find enclosed: ● Revised Architectural Plans prepared by Archend; ● Engineering Plans and Civil Technical Memorandum prepared by Recor; ● Revised Landscape Plans prepared by Anembo Consultants; ● Traffic Response Letter prepared by ITE Consulting. Please find below the response to each of the items raised by Council. Item 1 Provide additional detail demonstrating the extent of frontage works. The frontage works must be prepared by a suitably qualified person (RPEQ), comply with Council’s Planning Scheme Policy 6 – Engineering Design Standards, and include, but not be limited to: a. Construction of kerb and channelling for the length of the frontage to the subject site that is a continuation of the kerb line to the north of the subject site and 8m offset from the kerb and channel on the western side of Elanda Street; b. Continuation of road widening and sealing of existing pavement to the new kerb line; and c. Construction of a 1.5m pedestrian footpath for the full length of the site’s frontage to Elanda Street. Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor. The documentation confirms that kerb and channel is included along the full site frontage and road
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
pavement will be constructed to the crown on the development side. A 1.5m pathway is proposed along
site frontage, and this is reflected on all specialist documentation.
Item 2
Provide amended Engineering Plans demonstrating that the proposed works will not cause,
or do not have the reasonable potential to cause, adverse impacts to any existing
infrastructure within the road reserve. The detail must be prepared by a suitably qualified
person (RPEQ) and detail the horizontal and vertical clearances from any existing
infrastructure within the road reserve.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor,
confirming that, with the exception of the Energex assets relocation due to the proposed footpath, the
proposed works will not cause or have the potential to cause adverse impact to existing infrastructure
within the road reserve.
Item 3
Provide amended Development Plans (Architectural, Engineering & Landscaping Plans) that
includes the removal of the proposed western-most pedestrian steps as shown below.
Response: All submitted documentation has been revised to remove the previously proposed
western-most pedestrian steps.
Item 4
Provide a detailed design of the proposed “Basement Access” from the existing pedestrian
footpath and any “redesigned” pedestrian footpaths/stairs. The detailed design must be
prepared by a suitably qualified person (RPEQ) and include, but not be limited to:
a. the removal of all garden beds and retaining structures for the road reserve; and
b. a detailed design of the pedestrian footpath and staircase for the full length of the site
frontage to the road reserve (as shown below), including sections through the
“Basement Access” and southern elevations.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor.
The basement access has been redesigned and certified by an RPEQ. All documentation has been
updated accordingly.
Item 5
Provide confirmation that a 20% increase in rainfall intensity has been included as part of
the sizing of the on-site detention tanks as required by Acceptable Outcome 2.4 of the Water
Quality and Drainage Code.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor.
The memo confirms that a 12D model drainage analysis has been undertaken, and it was concluded that
compliance with AO2.4 of the Water Quality and Drainage code can be achieved, and the external pit has
sufficient capacity to capture all flows from the development.
Item 6
Provide an amended Stormwater Management Report and Basement Stormwater Layout
Plan that does not direct stormwater to a rubble pit.
2
Page 3
Item 7
Alternatively, provide written confirmation from a suitable representative of Tectonic stating
that the use of a rubble pit for ‘overflow’ is acceptable with respect to the Proposed Unit
Development report (24265-001-Rev0).
Item 8
Provide additional detail investigating the available capacity of the existing stormwater
network.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor.
The plans remove the garden bed and rubble pit, update the design of the detention tank to discharge to
the south to connect to existing infrastructure, and an overflow pipe is included which will discharge to
the east. A swale is also proposed along the retaining wall to ensure appropriate stormwater
management is achieved.
Item 9
Provide details of any proposed retaining structures including temporary and permanent
piling. The detail must be prepared by a suitably qualified person.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor,
which include details of the proposed retaining structures for the development.
Item 10
Provide additional detail demonstrating the extent of proposed earthworks within the road
reserve. The additional detail must be prepared by a suitably qualified person and include,
but not be limited to:
a. spot levels indicating the fill above natural ground;
b. demonstrate that existing subsurface infrastructure will not be adversely affected; and
c. ensure the existing drainage regime is not worsened.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor,
which now include spot levels and contours, proposed earthworks and demonstrates that the existing
subsurface infrastructure will not be adversely affected. Drainage will be improved through the proposed
kerb and channel infrastructure provided along the full site frontage.
Item 11
Provide additional detail about the proposed driveway crossover and internal down ramp.
The additional detail must be prepared by a suitably qualified person, be suitable for
construction, meet the recommendations contained in ITE Consulting’s Traffic Impact
Statement (Report No. 001, Rev. 01) dated 25 November 2024 and include, but not limited
to:
a. Dimensions, spot levels and grades of the driveway crossover and down ramp;
b. A longitudinal section extending from the centreline of Elanda Street to the bottom-
most section of the proposed basement demonstrating that the B85 vehicle will not scrap
or bottom out while entering and exiting the site.
3
Page 4
Response: Please refer to the attached Traffic Response Letter prepared by ITE Consulting, which
confirms an assessment of the ramp clearance has been undertaken for a B99 vehicle. Swept paths are
provided as an appendix confirming appropriate clearances are achieved.
Item 12
Provide additional detail demonstrating that Carparks 7 – 10 comply with Figure 5.2 of
AS2890.01. The additional detail must be prepared by a suitably qualified person and be
supported with amended Swept Paths.
Response: Please refer to the attached Traffic Response Letter and Appendix B prepared by ITE
Consulting, which confirms compliance with Figure 5.2 of AS2890.1:2004 will be achieved.
Item 13
Provide amended plans that demonstrate proposed Carparks 1 – 6 (car stackers) are
compliant with the manufacturer's Product Sheet (contained in ITE Consulting’s Traffic
Impact Statement (Report No. 001, Rev. 01) dated 25 November 2024). The amended plans
must be prepared by a suitably qualified person and include, but not be limited to:
a. a minimum 6.5 metre aisle width where the aisle services a car stacker, unless
otherwise justified (i.e., demonstrate the B85 vehicle can enter the carpark square
without manoeuvring with the carpark);
b. demonstrate that the location and linemarking of the proposed car stacker is suitable
for the entire system, including the necessary maintenance shafts and hydraulic
mechanisms; and
c. demonstrate the recommended drainage features of the car stacker are provided.
Response: Please refer to the attached Traffic Response Letter prepared by ITE Consulting, which
confirms:
● There are no dividing walls between car stacker bays, and accordingly compliance with Figure 5.2
of AS2890.1:2004 can be achieved;
● Relevant line marking will be undertaken at the Operational Works phase (based on manufacturer
requirements). Manufacturer details have been overlaid in Appendix B which indicates the likely
external line marking outlines.
● Civil Engineering Plans provided drainage and stormwater features, which detailed design to be
provided at the Operational Works phase.
We thank Council on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.
Should you have any questions with respect to the above, please do not hesitate to contact the
undersigned.
4
Page 5
Yours faithfully,
Adapt Development Management Pty Ltd
Liam Pinese Tiani Boulton
Managing Director Director
E: [email protected] E: [email protected]
M: 0432 497 857 M: 0404 924 160
5
Used in these records
RFI - Further Advice Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 254 KB (small file)
- File type
No other editions are linked here.