RFI - Further Advice Response · MCU24/0153
pavement will be constructed to the crown on the development side. A 1.5m pathway is proposed along
site frontage, and this is reflected on all specialist documentation.
Item 2
Provide amended Engineering Plans demonstrating that the proposed works will not cause,
or do not have the reasonable potential to cause, adverse impacts to any existing
infrastructure within the road reserve. The detail must be prepared by a suitably qualified
person (RPEQ) and detail the horizontal and vertical clearances from any existing
infrastructure within the road reserve.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor,
confirming that, with the exception of the Energex assets relocation due to the proposed footpath, the
proposed works will not cause or have the potential to cause adverse impact to existing infrastructure
within the road reserve.
Item 3
Provide amended Development Plans (Architectural, Engineering & Landscaping Plans) that
includes the removal of the proposed western-most pedestrian steps as shown below.
Response: All submitted documentation has been revised to remove the previously proposed
western-most pedestrian steps.
Item 4
Provide a detailed design of the proposed “Basement Access” from the existing pedestrian
footpath and any “redesigned” pedestrian footpaths/stairs. The detailed design must be
prepared by a suitably qualified person (RPEQ) and include, but not be limited to:
a. the removal of all garden beds and retaining structures for the road reserve; and
b. a detailed design of the pedestrian footpath and staircase for the full length of the site
frontage to the road reserve (as shown below), including sections through the
“Basement Access” and southern elevations.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor.
The basement access has been redesigned and certified by an RPEQ. All documentation has been
updated accordingly.
Item 5
Provide confirmation that a 20% increase in rainfall intensity has been included as part of
the sizing of the on-site detention tanks as required by Acceptable Outcome 2.4 of the Water
Quality and Drainage Code.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor.
The memo confirms that a 12D model drainage analysis has been undertaken, and it was concluded that
compliance with AO2.4 of the Water Quality and Drainage code can be achieved, and the external pit has
sufficient capacity to capture all flows from the development.
Item 6
Provide an amended Stormwater Management Report and Basement Stormwater Layout
Plan that does not direct stormwater to a rubble pit.
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Further Advice Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 254 KB (small file)
- File type
No other editions are linked here.