RFI - Further Advice Response · MCU24/0153
Response: Please refer to the attached Traffic Response Letter prepared by ITE Consulting, which
confirms an assessment of the ramp clearance has been undertaken for a B99 vehicle. Swept paths are
provided as an appendix confirming appropriate clearances are achieved.
Item 12
Provide additional detail demonstrating that Carparks 7 – 10 comply with Figure 5.2 of
AS2890.01. The additional detail must be prepared by a suitably qualified person and be
supported with amended Swept Paths.
Response: Please refer to the attached Traffic Response Letter and Appendix B prepared by ITE
Consulting, which confirms compliance with Figure 5.2 of AS2890.1:2004 will be achieved.
Item 13
Provide amended plans that demonstrate proposed Carparks 1 – 6 (car stackers) are
compliant with the manufacturer's Product Sheet (contained in ITE Consulting’s Traffic
Impact Statement (Report No. 001, Rev. 01) dated 25 November 2024). The amended plans
must be prepared by a suitably qualified person and include, but not be limited to:
a. a minimum 6.5 metre aisle width where the aisle services a car stacker, unless
otherwise justified (i.e., demonstrate the B85 vehicle can enter the carpark square
without manoeuvring with the carpark);
b. demonstrate that the location and linemarking of the proposed car stacker is suitable
for the entire system, including the necessary maintenance shafts and hydraulic
mechanisms; and
c. demonstrate the recommended drainage features of the car stacker are provided.
Response: Please refer to the attached Traffic Response Letter prepared by ITE Consulting, which
confirms:
● There are no dividing walls between car stacker bays, and accordingly compliance with Figure 5.2
of AS2890.1:2004 can be achieved;
● Relevant line marking will be undertaken at the Operational Works phase (based on manufacturer
requirements). Manufacturer details have been overlaid in Appendix B which indicates the likely
external line marking outlines.
● Civil Engineering Plans provided drainage and stormwater features, which detailed design to be
provided at the Operational Works phase.
We thank Council on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.
Should you have any questions with respect to the above, please do not hesitate to contact the
undersigned.
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Further Advice Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 254 KB (small file)
- File type
No other editions are linked here.