RFI - Further Advice Response · MCU24/0153
Item 7
Alternatively, provide written confirmation from a suitable representative of Tectonic stating
that the use of a rubble pit for ‘overflow’ is acceptable with respect to the Proposed Unit
Development report (24265-001-Rev0).
Item 8
Provide additional detail investigating the available capacity of the existing stormwater
network.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor.
The plans remove the garden bed and rubble pit, update the design of the detention tank to discharge to
the south to connect to existing infrastructure, and an overflow pipe is included which will discharge to
the east. A swale is also proposed along the retaining wall to ensure appropriate stormwater
management is achieved.
Item 9
Provide details of any proposed retaining structures including temporary and permanent
piling. The detail must be prepared by a suitably qualified person.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor,
which include details of the proposed retaining structures for the development.
Item 10
Provide additional detail demonstrating the extent of proposed earthworks within the road
reserve. The additional detail must be prepared by a suitably qualified person and include,
but not be limited to:
a. spot levels indicating the fill above natural ground;
b. demonstrate that existing subsurface infrastructure will not be adversely affected; and
c. ensure the existing drainage regime is not worsened.
Response: Please refer to the Engineering Plans and Civil Technical Memorandum prepared by Recor,
which now include spot levels and contours, proposed earthworks and demonstrates that the existing
subsurface infrastructure will not be adversely affected. Drainage will be improved through the proposed
kerb and channel infrastructure provided along the full site frontage.
Item 11
Provide additional detail about the proposed driveway crossover and internal down ramp.
The additional detail must be prepared by a suitably qualified person, be suitable for
construction, meet the recommendations contained in ITE Consulting’s Traffic Impact
Statement (Report No. 001, Rev. 01) dated 25 November 2024 and include, but not limited
to:
a. Dimensions, spot levels and grades of the driveway crossover and down ramp;
b. A longitudinal section extending from the centreline of Elanda Street to the bottom-
most section of the proposed basement demonstrating that the B85 vehicle will not scrap
or bottom out while entering and exiting the site.
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Further Advice Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 254 KB (small file)
- File type
No other editions are linked here.