Town Planning Report_FINAL
2.4 INFRASTRUCTURE/LOCAL GOVERNMENT INFRASTRUCTURE PLAN
2.4.1 SERVICES
The premise is serviced by reticulated water and sewer, which are both located at the site’s Duke Street
frontage, as shown in Figure 9 below.
Figure 9: Water and Sewer Services (Source: Unitywater)
2.4.2 LOCAL GOVERNMENT INFRASTRUCTURE PLAN
The site is located within the Priority Infrastructure Area (PIA) on Council’s LGIP mapping. Council’s
infrastructure mapping indicates that the site adjoins an existing trunk pathway (pink) and existing trunk
road – Collector (Green) along the Duke Street frontage, refer to Figure 10 below.
Figure 10: LGIP-Transport trunk infrastructure
Should the application be approved, development contributions will apply in accordance with Council’s
infrastructure charges resolution being the Noosa Shire Council charge resolution (No.7) 2022.
PLANNING REPORT – Revision A May 2023 P a g e | 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.