Council archive · source document
Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment · OPW21/0049
Attached to the e-mail Operational Works Application OPW21/0049 - Noosa Spit Erosion Protection Works.
Plans and drawings: the text below has words only, no drawings.
Noosa Spit Coastal Protection Environmental Assessment 19
Environmental Management Controls
6 Environmental Management Controls
The following specific environmental management controls relevant to MSES values which the
appointed dredge contractor will be contractually required to comply with:
• Preparing a detailed Environmental Management Plan for works.
• Minimising construction lighting, noise and other direct disturbance (e.g. presence of construction
plant and personnel), based on best practice standards, particularly during installation/removal of
the temporary delivery pipeline.
• Stop works procedures will be applied if there is a wildlife incident e.g. specific interaction between
contractors and animals until a suitable corrective measure can be applied, such as additional
training for construction staff in procedures.
• Undertaking water quality monitoring during dredging and beach nourishment and implementing
stop works procedures if targets exceeded.
• Setting water quality limits and requiring either stop works or corrective actions in the event of an
exceedance.
• Limiting dredging to above -3m AHD, where the risk of encountering acid sulfate soil material is
low. Regular testing of material to be dredged will also be undertaken to ensure that no acidic
material is disturbed.
• Contamination testing of material to be dredged prior to the commencement of works to ensure
material is suitable for placement.
• Dredging will be undertaken during winter months, when there are reduced numbers of shorebirds
present.
• Areas to be dredged and nourished will be checked for breeding birds prior to the commencement
of works by a qualified spotter/catcher. Should breeding birds be present, works will be moved
elsewhere until they move on, or the nest moved.
• On-board staff will undertake regular visual checks for marine fauna e.g. turtles; should they be
observed, dredging will slow or cease until the fauna has moved on.
• Any areas of marine plants and dunal vegetation will be clearly marked prior to nourishment, so
that placement over marine plants will be avoided.
• Dredge protocol to reduce the likelihood of entrainment including dredge vessels not turning
suction head on until device lowered to the sea floor.
• Dunal vegetation containing marine plants will be clearly marked, so that nourishment can be
placed around these areas and not directly on dunes or marine plants.
G:\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\03 approvals\R.A10342.002.00_Environmental
Assessment.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment.pdfRelated documentApplication case desk ↗
L.A10342.001.cover letter_lowres.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.