Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment · OPW21/0049

Attached to the e-mail Operational Works Application OPW21/0049 - Noosa Spit Erosion Protection Works.

of 146

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa Spit Coastal Protection Environmental Assessment                                                                                                   B-7
State Codes


 State Code 8: Coastal Development
 PO3 Development is located, designed and                   No acceptable outcome is prescribed.        Complies - the nourishment is designed to reduce
 constructed to minimise the impacts from coastal                                                       coastal erosion impacts.
 erosion by:
 1. locating the development as far landward as
 practicable; or
 2. where it is demonstrated that 1 is not feasible,
 mitigate or otherwise accommodate the risks posed
 by coastal erosion.


 PO4 Development does not significantly increase            No acceptable outcome is prescribed.        Complies – the purpose of the works is to improve
 the risk or impacts to people and property from                                                        recreational access to Dog Beach and prevent
 coastal erosion.                                                                                       further erosion of Noosa Spit and the potential of a
                                                                                                        ‘breakthrough’

 PO5 Development other than coastal protection              No acceptable outcome is prescribed.        NA
 work avoids directly or indirectly increasing the
 severity of coastal erosion either on or off the site.


 PO6 In areas where a coastal building line is              No acceptable outcome is prescribed.        N/A – works will not occur in an area where a
 present, building work is located landward of the                                                      coastal building line is present.
 coastal building line unless coastal protection work
 has been constructed to protect the development.


 Artificial Waterways
 PO7 Development of artificial waterways, canals            No acceptable outcome is prescribed.        N/A – works are not related to an artificial
 and dry-land marinas minimises impacts on coastal                                                      waterway.
 resources by:
 1. maintaining the tidal prism volume of the natural
 waterway to which it is connected
 2. demonstrating a whole-of-life strategy for the
 disposal of dredged material.
 Coastal Protection Work



 G:\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\03 approvals\R.A10342.002.00_Environmental Assessment.docx

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment.pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.