Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment · OPW21/0049

Attached to the e-mail Operational Works Application OPW21/0049 - Noosa Spit Erosion Protection Works.

of 146

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa Spit Coastal Protection Environmental Assessment                                                                                                 B-8
State Codes


 State Code 8: Coastal Development
 PO8 Works for beach nourishment minimise                   No acceptable outcome is prescribed.        Complies – sand sourcing is not expected to
 adverse impacts on coastal processes and avoid                                                         adversely affect the adjacent beach systems and
 any increase in the severity of erosion on adjacent                                                    will be sourced from the same environment.
 land by:
 1. sourcing sand from an area that does not
 adversely impact on the active beach system
 2. ensuring imported sand is compatible with
 natural beach sediments and coastal processes of
 the receiving beach.


 PO9 Erosion control structures are only constructed        No acceptable outcome is prescribed.        N/A – works does not involve construction of
 where there is an imminent threat to buildings or                                                      erosion control structures.
 infrastructure of value, and there is no feasible
 option for either:
 1. beach nourishment; or
 2. relocation or abandonment of structures.

 Note: The monetary value of buildings or
 infrastructure should be more than the cost of
 associated erosion control structures.
 PO10 Erosion control structures minimise                   No acceptable outcome is prescribed.        N/A – works does not involve construction of
 interference with coastal processes, or any increase                                                   erosion control structures.
 to the severity of erosion on adjacent land by:
 1. locating the erosion control structure as far
 landward as practicable and directly adjacent to the
 structure it is intended to protect
 2. where required and feasible, importing sand to
 the site to mitigate any increase in the severity of
 erosion
 3. the design of the structure.
 Water Quality




 G:\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\03 approvals\R.A10342.002.00_Environmental Assessment.docx

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Cover Letter, DA Form 1, Plans, Owners Consent, Coastal Environment Assessment.pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.