2605-52275 SRA - Response with conditions
Attached to the e-mail SARA response with conditions - MCU23/0007 & RAL23/0001.
2605-52275 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Material change of use
10.9.4.2.4.1 – Material change of use of premises near a state transport corridor —The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Transport
and Mian Roads to be the enforcement authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the following
condition(s):
1. (a) Noise attenuation measures to achieve the following noise Prior to the
criteria must be provided: commencement of use
and to be maintained at
(i) Balconies on the upper level of the east and south (Myall
all times.
Street) facing elevations as shown on Site Elevations,
prepared by Push, dated 16 April 2026, drawing number
2000, issue B must include balustrades that are solid, gap-
free and continuous for their complete length other than gaps
required for drainage purposes in accordance with the
Building Code of Australia.
(ii) Fencing provided along the eastern and southern boundary
adjacent the State-controlled road is to be solid gap-free
fence, or other solid gap free structure
(b) Noise attenuation measure must be a continuous solid gap-free
structure, constructed of glass, concrete blocks, bricks or fibre
cement sheeting, or balustrade, other than gaps required for
drainage purposes in accordance with the Building Code of
Australia.
2. (a) Close and remove the existing vehicular property access located Prior to the
between 18C5605 and Myall Street. commencement of use.
(b) The road works to close and remove access, referred to in part
(a) of this condition, must be in accordance with the Department
of Transport and Main Roads’ Road Planning and Design
Manual, 2nd Edition. The road works must:
(i) remove the driveway crossover and any drainage structure/s
beneath the driveway;
(ii) reinstate the kerb and channel;
(iii) reinstate road pavement after closure and removal;
(iv) establish a pedestrian pathway; and
(v) reinstate the table drain and/or grass footpath between the
pavement edge and the property boundary.
3. Direct access is not permitted between Myall Street and the subject At all times
site.
4. (a) Stormwater management of the development must not cause (a) At all times.
worsening to the operating performance of the state transport
corridor mode, such that any works on the land must not: (b) Prior to obtaining
i. create any new discharge points for stormwater runoff development
onto the state transport corridor mode approval for
ii. concentrate or increase the velocity of flows to state operational work.
transport corridor mode
State Assessment and Referral Agency Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2605-52275 SRA - Response with conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.