Original source · versioned page text
2605-52275 SRA - Response with conditions
Attached to the e-mail SARA response with conditions - MCU23/0007 & RAL23/0001.
2605-52275 SRA
iii. interfere with and/or cause damage to the existing (c) Within 20 business
stormwater drainage on the state transport corridor mode days of the
iv. surcharge any existing culvert or drain on the state completion of
transport corridor mode works.
v. reduce the quality of stormwater discharge onto the state
transport corridor mode
vi. impede or interfere with any overland flow or hydraulic
conveyance from the state transport corridor mode
vii. reduce the floodplain immunity of the state transport
corridor mode
(b) Submit RPEQ certification with supporting documentation to
[email protected] within the Department of
Transport and Main Roads, confirming that the development has
been designed in accordance with part (a) of this condition.
(c) Submit RPEQ certification with supporting documentation to
[email protected] within the Department of
Transport and Main Roads, confirming that the development has
been constructed in accordance with parts (a) and (b) of this
condition.
State Assessment and Referral Agency Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2605-52275 SRA - Response with conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.