ORDINARY MEETING AGENDA 16 FEBRUARY 2023
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection
to reticulated water and sewerage has been provided to the development site.
Services
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
26. Unless otherwise agreed in writing by the relevant service provider, any public or
third-party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development. Any repair work which proposes to alter the alignment or level
of existing services and assets must first be referred to the relevant service
authority for approval.
DEMOLITION WORKS
Performance Bond
28. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000
must be submitted to Council prior to the issue of a Development Permit for
Building Works for demolition, to secure the demolition conditions of this approval.
The cash bond or trading bank guarantee will be returned on performance of the
demolition conditions of this approval less any costs incurred by Council in respect
of enforcing performance of these demolition conditions. Council reserves the right
to call upon the bond or guaranteed sum to effect compliance with conditions.
Demolition must be undertaken in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting, air-borne hazards, atmospheric pollutants (including dust or odours)
nuisance or any other emissions in accordance with the nuisance provisions of the
Environmental Protection Act 1994.
Page 12 of 16