Original source · versioned page text
2023-02-16 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 16 FEBRUARY 2023
Waste Management
29. A Waste Management Plan (demolition) must be submitted in accordance with
Planning Scheme Policy PSP9 - Waste Management and approved by Council’s
Waste Coordinator prior to issue of a development permit for Building Works for
demolition, removal, or relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of
waste for the effective reuse and recycling of such materials. Segregated wastes
attract significantly reduced disposal fees at the landfill with some items free.
Higher gate fees are charged for mixed waste.
Waste storage areas must provide for adequate separation of all reusable,
recyclable and waste materials. These must be located so that they are convenient
and safe to use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
b. A waste management table as indicated below is to be completed showing
how waste material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Damage to infrastructure
30. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways must be repaired or reinstated to at least pre-existing
conditions.
Litter, erosion and sediment control
31. All waste materials must be removed from site. Litter, erosion and sediment control
Litter, erosion and sediment control measures must be installed and maintained
until soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or
storm water drainage system (e.g. roadside gutter).
Asbestos
32. Removal of building materials containing asbestos must be undertaken by a
licensed asbestos removalist.
33. Asbestos removal work (Section 466) of the Work Health and Safety Regulation
2011 requires a licensed asbestos removalist to give notice to Workplace Health
and Safety Queensland (WHSQ) of licensed asbestos removal work at least five
days before the work commences. Notification must be made using Form 65:
Notification of licensed asbestos removal work, demolition work or emergency
demolition.
34. All building materials containing asbestos products are wrapped and disposed of
in accordance with the Public Health Regulation 2006 and the Environmental
Protection Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science
licenses businesses that transport asbestos waste, and landfills that accept this
waste.
35. All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
Page 13 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.