36. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that
at demolition of a building, the existing sanitary drain upstream from the connection
point for a service provider’s sewerage system must be sealed watertight. This
work is deemed as notifiable Work and must be carried out by a suitably licenced
plumber who must submit an As Constructed plan and Form 4 (Notifiable Works
Form) to the QBCC (Queensland Building Construction Commission) within 10
days of completing the work.
37. A separate development permit for Operational Works landscaping must be
submitted to and approved by Council prior to issue of an application for Building
Approval. The landscape plan is to detail the provision of:
• permanent planters along the upper floor plan terrace area
• permanent planters along central lobby
• internal green walls around internal stairwell
• planter to support vine over pergola
• feature tree and understorey planting of ground level
All landscaping on site is to be maintained for the life of the development.
B. Include the following advisory note in addition to that the standard advisory notes :
Activities within Road Reserve/Pathways/Car spaces
1. Safe vehicle and pedestrian access in the vicinity of the development must be
maintained at all times. Should closures of footpath/roads/carspaces be necessary
to carry out construction works, a permit from Council’s Infrastructure Section must
be obtained prior to any works being undertaken.
2. Council encourages the implementation of sustainable and efficient energy
infrastructure to minimise energy consumption and the production of greenhouse
gases. In this regard Council recommends the installation of solar panels for the
development.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
2 MCU19/0089.02 & OPW19/0160.02 – PLANNING & ENVIRONMENT COURT APPEAL NO.
DB928/2022 – APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL
FOR SERVICE STATION AND SHOP AND OPERATIONAL WORKS – SIGNAGE AT 54
MARY STREET, NOOSAVILLE
That Council note the report by the Acting Manager Development Assessment to the Planning
& Environment Committee Meeting dated 7 February 2023 regarding Planning & Environment
Court Appeal No. DB928/2022 and agree to settle the appeal generally in accordance with the
following changes to the development approval:
A. Amend conditions 5, 103 and 105 to read as follows:
5. The approved use must not operate outside the hours of 4am to 10pm.
103. Advertising devices undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed in
the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A-7001 7 Signage Elevations, prepared by V Architecture 20.12.2021
105. This approval authorises the following signs as defined by the planning scheme
and shown on the Approved Plans. In this regard the plans must be amended to
reflect the following:
a. The pylon sign must be setback at least 1.50 metres from the front boundary
Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.