Council archive · source document
Apdx 3 - Civil Eng Plans · MCU24/0001
Plans and drawings: the text below has words only, no drawings.
SITE ADDRESS / PROPERTY ID
2 JAN STREET
NOOSA HEADS, QLD, 4567
CLIENT
GREG & KERI VENTER
(IZAROX PTY LTD)
PROJECT & PHASE
DUAL OCCUPANCY
OPERATIONAL WORKS - CIVIL
DRAWING INDEX
DRAWING No. REV DRAWING TITLE
230703-OPW-C-001 A COVER SHEET, LOCALITY & DRAWING INDEX
230703-OPW-C-011 A GENERAL NOTES & DETAILS
230703-OPW-C-101 A EXISTING FEATURES PLAN
230703-OPW-C-201 A EARTHWORKS PLAN
230703-OPW-C-231 A EROSION & SEDIMENT CONTROL NOTES & STANDARD DETAILS
JAN STR 230703-OPW-C-301 A DEVELOPMENT SITE PLAN
EET SITE LOCATION
230703-OPW-C-371 A CONCRETE JOINTING PLAN
230703-OPW-C-372 A CONCRETE JOINTING DETAILS
NUE
230703-OPW-C-501 A SEWER & WATER NOTES & DETAILS
230703-OPW-C-502 A SEWER & WATER PLAN
IA AVE
BANKS
IMAGE (NEARMAPS)
LOCALITY PLAN
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-001.DWG
SCALE N.T.S
SURVEY DATA
SURVEYED BY FOCUS ON SURVEYING
DATED 25.09.23.
PLAN REFERENCE FSC-432
RP DESCRIPTION
LOT 15 RP90014
SITE AREA = 639m²
Last saved by: HARRYDAVIES(2023-12-18) Last Plotted: 2023-12-18 4:45 PM
COUNCIL PERMIT No. MCU TBA/ OPW TBA
Project No. Status Drawing No. Rev No.
230703 FOR APPROVAL OPW-C-001 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 6 (of 9)
Page 2
ROADWORKS / DRIVEWAY NOTES: STORMWATER DRAINAGE NOTES:
GENERAL NOTES: 1. COMPACT THE EXPOSED SUBGRADE OR LOOSE TOP LEVEL MATERIAL TO A MINIMUM 100% STANDARD MAXIMUM 1. ALL STORMWATER DRAINAGE HAS BEEN DESIGNED AND IS TO BE CONSTRUCTED IN ACCORDANCE WITH
1. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTATION, LOCAL AUTHORITY DRY DENSITY (MDD) TO AS1289. ANY 'SOFT SPOTS' IDENTIFIED BY THE PROOF ROLLING SHALL BE REMOVED AND AS3500, LOCAL COUNCIL AUTHORITY REQUIREMENTS, IPWEA AND QUDM.
SPECIFICATIONS (OR ARCOS GROUP SPECIFICATIONS IF SUPPLIED). ANY POINT OF CONFLICT IS TO BE REPLACED WITH A COMPACTED IMPORTED GENERAL FILL MATERIAL TO THE ABOVE COMPACTION 2. EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH
IDENTIFIED BY THE CONTRACTOR AN WILL BE RESOLVED BY THE SUPERINTENDENT. REQUIREMENTS. IPWEA STD DRG DS-030.
2. THE DEVELOPER IS TO NOMINATE THE SUPERINTENDENT AND/OR THE SUPERVISING RPEQ FOR THE WORKS 2. ALL EXPOSED SUBGRADE AREAS SHALL BE COMPACTED IN LAYERS NOT EXCEEDING 150mm COMPACTED 3. ALL MANHOLES TO BE MIN 1050mm DIAMETER IN ACCORDANCE WITH IPWEA STD DRG DS-010.
AND NOTIFY ALL RELEVANT PARTIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THICKNESS.
4. ALL GRATES & MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS 'D'
3. DIMENSIONS IN METRES (U.N.O). DO NOT SCALE FROM DRAWINGS. USE PRINTED DIMENSIONS ONLY AND IF IN 3. GEOTECHNICAL INVESTIGATIONS REQUIRED IN ORDER TO DETERMINE SUBGRADE PROPERTIES & PREPARATION IN ACCORDANCE WITH IPWEA STD DRG DS-019.
DOUBT ASK SUPERINTENDENT FOR CLARIFICATION. DETAILS. CONTRACTOR TO UNDERTAKE 4-DAY SOAKED CBR ON EXISTING SUBGRADE AND RESULTS TO BE A
MINIMUM OF 5%. TESTING TO BE PROVIDED TO SUPERVISING ENGINEER PRIOR TO PROOF ROLL. 5. ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS 'B' U.N.O WARNING
4. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH COUNCIL APPROVAL CONDITIONS, DEVELOPMENT IN ACCORDANCE WITH IPWEA STD DRG DS-020.
GUIDELINES, ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. 4. LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF TOPSOIL LAYER OR BUILDING SLAB THICKNESS. BEWARE OF UNDERGROUND SERVICES
6. ALL REINFORCED CONCRETE PIPES ARE TO BE INSTALLED USING TYPE 'HS2' SUPPORT AS DEFINED IN AS
5. EXISTING SERVICES AND STRUCTURES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR 5. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE 3725 - LOADS ON BURIED CONCRETE PIPES. IF ALTERNATIVE BEDDING METHODS ARE TO BE USED THE POSITION OF EXISTING UNDERGROUND SERVICES SHOWN
ACCURACY CANNOT BE GUARANTEED. IT IS THE CONTRACTORS RESPONSIBILITY TO ESTABLISH THE LOCATION DRAWINGS AND/OR TYPICAL SECTIONS. PIPE CLASS MUST BE REVIEWED. IS APPROXIMATE ONLY. EXACT POSITION SHALL BE
AND LEVEL OF ALL EXITING SERVICES PRIOR TO COMMENCEMENT OF ANY WORK. DISCREPANCIES SHALL BE 6. CONTRACTOR TO OBTAIN ROADWORKS AND FOOTPATH PERMITS FOR ANY PROPOSED WORKS EXTERNAL TO
REPORTED TO THE SUPERINTENDENT. 7. ALL PIPES ABOVE 300Ø RCP TO BE RRJ CLASS 3 UNO. PIPES 300Ø AND BELOW TO BE UPVC UNO. HDPE/PP PROVEN ON SITE BY THE CONTRACTOR PRIOR TO
THE SITE BOUNDARY. MAY BE USED AS AN RCP ALTERNATIVE FOR INTERNAL AND COUNCIL STORMWATER WHERE APPROVED BY COMMENCEMENT OF CONSTRUCTION
6. ON COMPLETION OF SERVICES INSTALLATION, ALL AREAS SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING 7. SUBSOIL DRAINAGE UNDER KERBS TO BE IN ACCORDANCE WITH IPWEA STD DRG RS-140. REQUEST.
KERBS, FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.
8. ALL TEMPORARY AND FINAL BATTER SLOPES ARE TO BE INSPECTED BY AN APPROVED GEOTECHNICAL 8. STORMWATER PIPE CLASSES HAVE BEEN DESIGNED FOR SERVICE LOADS ONLY, THE CONTRACTOR SHALL
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO COUNCILS INFRASTRUCTURE. ENGINEER. ASSESS ANTICIAPTED CONSTRUCTION LOADS AND UPGRADE THE PIPE CLASSES, IF NECESSARY, IN
SUCH REPAIR OR REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF LOCAL ACCORDANCE WITH AS 3725, AT THE CONTRACTORS COST.
LOCATION OF SERVICES
COUNCIL. EARTHWORKS NOTES: PRIOR TO COMMENCEMENT OF NEW WORK THE
9. UNLESS DIRECTED OTHERWISE STORMWATER STRUCTURES INCLUDING HEADWALLS ARE TO HAVE CONTRACTOR SHALL CONFIRM LOCATIONS, LEVELS AND
8. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN, AG-PIPE DRAINAGE STUBS (WITH END CAP) TO DEWATER DRAINAGE TRENCH.
1. ALL EXCAVATION AND FILLING SHALL BE CONSTRUCTED IN ACCORDANCE WITH AS3798 AND IN ACCORDANCE DETAILS OF EXISTING CONNECTION POINTS AND SERVICE
ENVIRONMENTAL MANAGEMENT PLAN AND WORKPLACE HEALTH AND SAFETY PLAN FOR REVIEW AND
APPROVAL OF PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION. WITH THE CURRENT LOCAL AUTHORITY/EDQ AND ARCOS SPECIFICATIONS. 10. THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES CROSSINGS BY POT HOLING. IF A VARIATION OCCURS
2. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL BEFORE AND STRUCTURES. CONTACT THE ENGINEER PRIOR TO CONSTRUCTION.
9. ALL MATERIALS SPECIFIED ARE TO BE UTILISED, UNLESS WRITTEN APPROVAL FROM THE SUPERINTENDENT,
SUPERVISING RPEQ OR APPROVING AUTHORITY. COMMENCING UP-SLOPE EARTHWORKS. 11. ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES/PITS.
10. THE CONTRACTOR IS TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE HEALTH AND SAFETY 3. THE CONTRACTOR SHALL REMOVE ALL STRUCTURES, DEBRIS AND FENCES FROM THE SITE TO THE 12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION
REQUIREMENTS. SATISFACTION OF THE SUPERINTENDENT. IS IN ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY PROTECTION OF SERVICES
4. EXISTING SURFACE IS TO BE CLEAR OF ORGANIC MATERIAL PRIOR TO THE START OF FILLING. LEGISLATION. THE CONTRACTOR SHALL CONTACT THE RELEVANT
11. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE IN CLOSE PROXIMITY TO NEIGHBOURING LOT
BOUNDARIES OR INFRASTRUCTURE, THE CONTRACTOR IS TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL 5. FILL IS TO BE OF GOOD QUALITY AND FREE OF UNSUITABLE MATERIAL. 13. THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO AUTHORITIES AND ARRANGE FOR RELOCATION AND / OR
MEASURES NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS BACKFILLING OF TRENCHES AND STRUCTURES. PROTECTION OF EXISTING SERVICES AS REQUIRED TO SUIT
MAY INCLUDE THE USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED. 6. FILL TO BE PLACED IN MAXIMUM 200mm LIFTS, UNLESS APPROVED OTHERWISE BY A SUITABLY QUALIFIED
14. THE CONTRACTOR SHALL DEMONSTRATE NO DAMAGE TO EXISTING STORMWATER INFRASTRUCTURE HAS SURROUNDING NEW WORK, CONSTRUCTION LOADINGS AND
CONSULTANT, AND COMPACTED TO SPECIFICATION. OCCURRED DURING THE CONSTRUCTION OF THESE WORKS.
12. THE CONTRACTOR SHALL NOTIFY ALL RELEVANT AUTHORITIES AND ENSURE REQUIRED CONDITIONS HAVE BEEN TO SUIT FINAL FINISHED SURFACE LEVELS AND GRADES.
MET PRIOR TO COMMENCEMENT. THE CONTRACTOR SHALL NOTIFY ARCOS GROUP PRIOR TO COMMENCING 7. NOTWITHSTANDING THE LIMITS OF CUTTING AND FILLING SHOWN ON THE DRAWINGS, THE ACTUAL LIMITS 15. UPON COMPLETION, ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND
WORKS AND RECEIVE WRITTEN CONFIRMATION THAT THE WORKS CAN COMMENCE. SHALL BE DETERMINED ON SITE BY THE SUPERINTENDENT DURING CONSTRUCTION. SIMILARLY, THE FINISHED OTHER BLOCKAGES.
13. CONTRACTOR SHALL PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS IN ACCORDANCE SURFACE LEVELS MAY BE ADJUSTED BY THE WRITTEN DIRECTION OF THE SUPERINTENDENT DURING
WITH COUNCIL REQUIREMENTS UNLESS OTHERWISE ADVISED BY ARCOS GROUP. CONSTRUCTION AFTER AMENDED DRAWINGS HAVE BEEN APPROVED BY COUNCIL.
16. THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER SETTING OUT
DRAINAGE ASSETS FOR APPROVAL BY THE ENGINEER AND/OR LOCAL AUTHORITY.
8. ALL AREAS SUBJECT TO EARTHWORKS ARE TO BE FREE DRAINING WITH A MINIMUM SLOPE OF 1:100 (1%). DESIGN FINISHED SURFACE LEVELS OF STRUCTURES ARE FOR
14. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED; 17. ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE CONTRACTOR'S GUIDANCE ONLY. ACTUAL FINISHED LEVELS
· CONSTRUCTION PRE-START MEETING 9. ALL DRAINAGE STRUCTURES ARE TO BE PRESERVED FROM THE EFFECTS OF STRUCTURAL LOADING THE CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE SHALL BE SET OUT AS DIRECTED ON-SITE IN KEEPING WITH THE
GENERATED BY THE EARTHWORKS. CONTRACTOR, UNLESS IT CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND REQUIREMENTS AND SPECIFICATIONS OF THE LOCAL AUTHORITY
· SET OUT THE RESPONSIBILITY OF OTHER PARTIES. AND ACTUAL FINISHED GROUND LEVELS.
10. ANY AREA DISTURBED OUTSIDE OF THE WORKS AREA SHOWN SHALL BE REHABILITATED TO A MINIMUM OF THE
· DEMOLITION 18. RESIDENTIAL DRAINAGE CONNECTIONS TO KERB AND CHANNEL REFER TO IPWEA STD DRG RS-081.
PRE-CONSTRUCTION CONDITIONS, AT THE CONTRACTORS EXPENSE.
· SUBGRADE PROOF-ROLLS
11. EARTHWORKS BATTERS ARE TO BE TREATED AS FOLLOWS:
· PRE-SEAL PROOF-ROLLS
· 1:4 OR FLATTER TO BE GRASS SEEDED U.N.O
· CONCRETE PRE-POURS
· STEEPER THAN 1:4 TO BE MULCHED & PLANTED IN ACCORDANCE WITH THE LANDSCAPE PLANS
· FINAL INSPECTION 13. TREE REMOVAL WORKS TO BE UNDERTAKEN BY A SUITABLY QUALIFIED AND INSURED CONTRACTOR. TIMBER IS
15. THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, TO BE REMOVED, REUSED OR RECYCLES IN AN APPROPRIATE AND A SUSTAINABLE MANNER WHERE POSSIBLE.
SUCH AS:
● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
● REQUIRED WATER QUALITY OBJECTIVES; SIGNAGE & LINEMARKING NOTES:
● PERFORMANCE MONITORING AND INSPECTION PROCEDURES; 1. ALL LINEMARKING, SIGNAGE AND R.R.P.M's SHALL BE IN ACCORDANCE WITH THE "MANUAL OF UNIFORM TRAFFIC
● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS; CONTROL DEVICES" (MUTCD).
● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS; 2. ALL CARPARK LINEMARKING TO BE IN ACCORDANCE WITH THE DIMENSIONAL REQUIREMENTS OF AS2890
3. ALL LINEMARKING ON AC PAVEMENTS SHALL BE WHITE, TYPE 1 ROAD MARKING PAINT 80-100mm WIDE, REFER
· REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
MRS 11.45 SPECIFICATIONS (U.N.O.)
4. ALL LINEMARKING ON CONCRETE PAVEMENTS SHALL BE GOLDEN YELLOW COLOUR NO. Y14 AS 2700 AND
80-100mm WIDE (U.N.O.)
ENVIRONMENTAL MANAGEMENT NOTES:
5. ALL REDUNDANT PAVEMENT MARKING SHALL BE REMOVED VIA ABRASIVE BLASTING IN ACCORDANCE WITH THE
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL ENVIRONMENTAL PROTECTION MEASURES BEING IMPLEMENTED REQUIREMENTS OF DTMR's STANDARD SPECIFICATION No. MRTS45.
ON SITE PRIOR AND DURING CONSTRUCTION.
6. PROPLE WITH DISABILITY (PWD) CARPARK LINEMARKING TO AS2890.6 (YELLOW CHEVRON AND OUTLINE,
2. NO VEGETATION BEYOND THE EXTENT OF EARTHWORKS OR THAT SHOWN ON THE PLANS IS TO BE UNDERTAKEN
WITHOUT PRIOR CONSENT FROM THE SUPERINTENDENT. YELLOW BOLLARD, BLUE SYMBOL)
3. ALL VEGETATION BEING RETAINED ON SITE MUST BE IDENTIFIED AND PROTECTED FROM DAMAGE. 7. WHEEL STOP SETOUT TO AS2890.1
8. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1743 UNLESS NOTED OTHERWISE
4. EROSION AND SEDIMENT CONTROL IS THE RESPONSIBILITY OG THE CONTRACTOR AND MUST BE IMPLEMENTED
PRIOR TO CONSTRUCTION COMMENCING AND DURING CONSTRUCTION. 9. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE SIGN:
5. ALL DISTURBED AREAS SHALL BE LEFT IN A STABLE CONDITION. THIS WILL INVOLVE SEEDING OR TURFING WITH · NO KERB = 600mm BEHIND GUIDE POSTS
APPROPRIATE GRASS SPECIES. ANY DISTURBED SLOPES SHALL BE COVERED WITH A SUITABLE FORM OF · BARRIER KERB = 300mm FROM FACE OF KERB
EROSION CONTROL.
6. PIPELINES ADJACENT TO SIGNIFICANT TREES MUST BE INSTALLED BY BORING OR DIRECTIONAL DRILLING · MOUNTABLE KERB = 500mm FROM FACE OF KERB
UNLESS OTHERWISE AGREED WITH THE SUPERINTENDENT. 10. A FLEXIBLE STRIKER BAR SHALL BE PROVIDED IN CONJUNCTION WITH SIGNAGE WHERE CLEARANCE LESS THAN
7. TOPSOIL AND SUBSOIL MUST BE STOCKPILED SEPARATELY AND NOT LOCATED UNDER TREE CANOPIES. 2.3m OCCURS.
8. ALL STOCKPILES MUST HAVE APPROPRIATE SEDIMENT CONTROLS IN ACCORDANCE WITH THE ENVIRONMENTAL 11. CARPARK LINEMARKING TO BE IN ACCORDANCE WITH AUSTRALIAN STANDARD 'AS2890.1 SPECIFICATIONS.
MANAGEMENT PLAN.
9. NO SOIL CAN BE STOCKPILED WITHIN 5M OF ANY CREEK OR WATER COURSE.
10. ANY SOIL DISTURBED ON SITE IS TO BE REUSED ON SITE. ANY UNSUITABLE MATERIAL NOT REUSED MUST BE
DISPOSED OF AT A REGULATED WASTE DISPOSAL FACILITY.
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-011.DWG
Last saved by: HARRYDAVIES(2023-12-18) Last Plotted: 2023-12-18 4:45 PM
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn HD Project No. Drawing No. Rev No.
GREG & KERI VENTER DUAL OCCUPANCY GENERAL NOTES & DETAILS
Design HD
(IZAROX PTY LTD) OPERATIONAL WORKS - CIVIL
Vert. Datum
AHD
2 JAN STREET Check GM
230703 OPW-C-011 A
RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL NOOSA HEADS, QLD, 4567 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
18.12.23 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
18.12.23 Status FOR APPROVAL
Size A1
Page 3
EXISTING LEGEND
SUBJECT PROPERTY BOUNDARY
4.00 MAJOR CONTOUR
MINOR CONTOUR
SEWER MAIN DN150
WATER MAIN DN100
U/G TELECOMMS
O/H ELECTRICITY
STORMWATER
FENCE
TO BE REMOVED
EXISTING AC WATER MAIN
EXISTING FIRE HYDRANT NOTES:
1. FOR GENERAL NOTES REFER DRG C-011.
JAN STR DRIVEWAY TO BE REMOVED
EE T
EXISTING AC WATER MAIN DEMOLITION
DEMOLISH OR RELOCATE OFF SITE ALL EXISTING BUILDINGS
23.0 AND/OR STRUCTURES ON SITE AND DISCONNECT AND
WHERE REQUIRED CAP ALL ASSOCIATED SERVICES IN
ACCORDANCE WITH A PLUMBING AND DRAINAGE
APPLICATION PRIOR TO DEMOLITION COMMENCING.
CLEARING
THE CONTRACTOR SHALL REMOVE ALL EXISTING
EXISTING AC WATER MAIN VEGETATION WITHIN THE SITE IN ACCORDANCE WITH
THE APPROVED TREE RETENTION PLAN IF SPECIFIED.
·
21.0
EXISTING STORMWATER GULLEY PIT
22.0
EXISTING TRAFFIC SIGN
·
23.0
NUE
IA AVE
·
BANKS
22.0
EXISTING WATER METER
15
RP90014
EXISTING POWER POLE
·
23.0
EXISTING TELSTRA PIT
23.0
EXISTING SEWER MANHOLE
EXISTING AC WATER MAIN ·
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-101.DWG
EXISTING AC SEWER MAIN
EXISTING AC SEWER MAIN
Last saved by: HARRYDAVIES(2023-12-18) Last Plotted: 2023-12-18
ALL EXISTING FEATURES & STRUCTURES
TO BE REMOVED AS DIRECTED
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn HD Project No. Drawing No. Rev No.
GREG & KERI VENTER DUAL OCCUPANCY EXISTING FEATURES
Design HD
(IZAROX PTY LTD) OPERATIONAL WORKS - CIVIL PLAN
0m
A1 1:100
2.5 5
Vert. Datum
AHD
2 JAN STREET Check GM
230703 OPW-C-101 A
RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL NOOSA HEADS, QLD, 4567 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
18.12.23 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
18.12.23 Status FOR APPROVAL
Size A1
Page 4
EXISTING LEGEND
SUBJECT PROPERTY BOUNDARY
4.00 MAJOR CONTOUR
MINOR CONTOUR
SEWER MAIN DN150
WATER MAIN DN100
U/G TELECOMMS
O/H ELECTRICITY
STORMWATER
FENCE
20.000 SURFACE LEVEL
INLET PROTECTION TO BE PROVIDED
AROUND GULLEY PIT
PROPOSED LEGEND
CUT
FILL
JAN STR
EET 50.00 MAJOR CONTOUR 1m INTERVAL
PROVIDE SAND BAGS IN KERB & CHANNEL DOWN SLOPE MINOR CONTOUR 0.25m INTERVAL
OF CROSSOVER TO CAPTURE COARSE SEDIMENTS FLOW DIRECTION
23.0
SEDIMENT FENCE
RETAINING WALL
TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP 20.000 DESIGN SURFACE LEVEL
REFER TO STD IPWEA DS-040 INLET PROTECTION
TEMPORARY CONSTRUCTION FENCE TO BE INSTALLED WITH 21
LOCKABLE GATE TO BOUNDARY AS REQUIRED TO SECURE SITE .0
·
22.50 21.0
22.0
23.
TW 22.55
75
BW 21.58
0
2222.5
22.
.00
.2 5 21. EARTHWORKS QUANTITIES
·
25
TOP SOIL STRIP: 66m3
21. EARTHWORKS CUT: -72m3
5 0 EARTHWORKS FILL: 145m3
BALANCE: 73m3
23.0 21.
75
NUE
NOTES:
22.50 1. ALL VOLUMES INDICATED ARE SOLID VOLUMES.
22.0 2. ASSUMED TOP SOIL STRIP 150mm THICK.
IA AVE
3. EARTHWORKS QUANTITIES BASED ON COMPARISON BETWEEN
22.25 DESIGN SURFACE AND SURVEY SURFACE.
TW 22.45
22.50 BW 21.95
·
BANKS
22.50
5
5
UNIT A GARAGE NOTES:
23.7
.7
22.50
23.50
23
22.0
23.25
FFL 22.70 1. FOR GENERAL & EARTHWORKS NOTES REFER DRG C-011.
UP
23.0
22.75
22.50
2. FOR EROSION & SEDIMENT CONTROL NOTES & DETAILS REFER DRG C-231.
3. RETAINING WALLS TO BE DESIGNED BY OTHERS / STRUCTURAL ENGINEER.
UNIT A 15
FFL 22.70 RP90014 UNIT A GARAGE
FFL 22.70
·
UP
23.0 UNIT B
FFL 22.70
TW 22.55
BW 23.23 23.0
·
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-201.DWG
TW 22.45
BW 21.45
RETAINING WALLS TO BOUNDARY
DESIGNED BY OTHERS
MIN 0.6m CLEARANCE TO SEWER PIPE FOR
EXCAVATION WORKS (MIN 1.0m FOR BORED PIERS).
WALL FOOTING PIERS INFLUENCE LINE TO BE
300mm BELOW SEWER IL
Last Plotted: 2023-12-18 4:46 PM
Last saved by: HARRYDAVIES(2023-12-18)
THE EROSION & SEDIMENT CONTROL PLAN IS A CONCEPT PLAN
DEMONSTRATING AN APPROACH TO EROSION & SEDIMENTATION CONTROL
FOR THE SITE. IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE AN
EROSION & SEDIMENT CONTROL DESIGN AND A COMPLETED DESIGN
CERTIFICATE PRIOR TO COMMENCEMENT OF WORK. CERTIFICATION MUST BE
UNDERTAKEN BY A SUITABLY QUALIFIED, EXPERIENCED PROFESSIONAL.
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn HD Project No. Drawing No. Rev No.
GREG & KERI VENTER DUAL OCCUPANCY EARTHWORKS
Design HD
(IZAROX PTY LTD) OPERATIONAL WORKS - CIVIL PLAN
0m
A1 1:100
2.5 5
Vert. Datum
AHD
2 JAN STREET Check GM
230703 OPW-C-201 A
RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL
NOOSA HEADS, QLD, 4567 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
18.12.23 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
18.12.23 Status FOR APPROVAL
Size A1
Page 5
GENERAL:
1. TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER STD DRG IPWEA DS-040 &
DS-041.
2. TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE WHERE FORMED TOP WIDTH
POSSIBLE. GEOTEXTILE LINED OR EQUIVALENT
FORMED TOP WIDTH GEOTEXTILE
3. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE
0.15 (MIN)
RUNOFF LINED OR EQUIVALENT
COMMENCING UP-SLOPE EARTHWORKS. RUNOFF
0.15 (MIN)
4. CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER SIGNIFICANT RUNOFF
PRODUCING STORMS.
5. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER 2 (min)
MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE
EXPECTED TO BE DELAYED FOR MORE THAN I4 DAYS. FILTER SOCKS OVERLAP 1
6. CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS CONTROLLED AND 70% ONTO KERB 4.0m MIN
PERMANENT SOIL COVERAGE IS OBTAINED OVER ALL UPSTREAM DISTURBED LAND.
7. STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH GENERALLY SHOULD NOT BE
SEDIMENT POND
USED IF OTHER OPTIONS ARE AVAILABLE.
3. ALL CAPTURED RUNOFF MUST BE TREATED TO <75NTU PRIOR TO DISCHARGE.
RUN-OFF NON-DISPERSIVE SUBSOIL
4. SITE TO BE PROGRESSIVELY STABILISED, AIMING FOR 60% STABILISATION WITHIN 20 DAYS FROM
NON-DISPERSIVE SUBSOIL
START OF WORKS AND 70% OR GREATER WITHIN 2 MONTHS.
5. ALL INLET PITS TO BE PROTECTED IMMEDIATELY. 1m MAX ON (c) PARABOLIC CATCH DRAIN WITHOUT BANK
BYPASS FLOW PUBLIC ROADS (a) PARABOLIC CATCH DRAIN WITH DOWN-SLOPE BANK
6. EROSION AND SEDIMENT CONTROL MEASURES TO BE PROGRESSIVELY REMOVED AS SITE
STABILISATION IS ACHIEVED.
(a) ON-GRADE KERB INLET SEDIMENT TRAP FORMED TOP WIDTH GEOTEXTILE
CONSTRUCTED DIMENSIONS OF PARABOLIC CATCH DRAINS
SEDIMENT CONTROL: FILTER SOCKS MAY NEED TO LINED OR EQUIVALENT
1. ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL FULLY SURROUND THE INLET TO DRAIN TYPE FORMED TOP WIDTH WITH OR WITHOUT
0.15 (MIN)
EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. THE INTERCEPT SEDIMENT RUNOFF RUNOFF BANK FORMED DEPTH WITH OR WITHOUT BANK
PVC PIPE SPACERS
BASIC PRINCIPLES ARE TO: FROM THE ROAD AND VERGE TYPE - A 1.6m 0.3m
· MINIMISE THE AREA OF DISTURBANCE;
· CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE; 2 (MIN) TYPE - B 2.4m 0.45m
· MINIMISE EROSION; 1 TYPE - C 3.6m 0.65m
· MINIMISE SEDIMENTATION;
· PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE FILTER SOCK
2. SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE CONSTRUCTED DIMENSIONS OF TRIANGULAR V-DRAINS
SIDE INLET REMAINS OPEN
CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED GULLY GRATE WRAPPED IN NON-WOVEN FILTER DRAIN TYPE FORMED TOP WIDTH WITH OR WITHOUT
NECESSARY THROUGHOUT CONSTRUCTION. FABRIC (MINIMUM, BIDIM A34 OR EQUIVALENT) BANK FORMED DEPTH WITH OR WITHOUT BANK
3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL
NON-DISPERSIVE SUBSOIL
TYPE - AV 2.0m 0.3m
ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF (b) SAG INLET SEDIMENT TRAP
MAINTENANCE OF WORKS.
TYPE - BV 2.7m 0.45m
4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE
SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:
KERB INLET PROTECTION (b) TRIANGULAR V-DRAIN WITH DOWN-SLOPE BANK
TYPE - CV 3.9m 0.65m
a. STRIPPING OF TOPSOIL AND GRASS.
SCALE N.T.S. LINED CATCH DRAIN
SCALE N.T.S.
b. BULK EARTHWORKS TO THE SITE.
c. SERVICES INSTALLATION.
d. PAVEMENT CONSTRUCTION.
6. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED
IN WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL SEDIMENT COLLECTION PIT EXCAVATED AROUND INLET
APPLICATIONS.
2m (MIN)
7. BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION CONTROL DEVICES SHALL BE FLOW CONTROL BERM INCORPORATED INTO THE
MINIM ROCK PAD IF THE PAD RECEIVES RUNOFF FROM
MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION UM LE
NGTH
OF THE SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED 10m (M THE BUILDING SITE (LOCATION MAY VARY)
IN)
BY 30%.
40-75mm CRUSHED ROCK 300mm (MIN)
8. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION BUILDING LAND
10m (MIN)
WITH THE APPROVED DRAWINGS. SITE SLOPE
150-200mm N
9. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE MI KERB
m
SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH 2.0
ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. Y
UP-SLOPE RUNOFF BD FOOTPATH
10. IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN DIRECTED TO AN RP
MAKE SAFE FOR
SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE APPROPRIATE ROADWAY FOOTPATH
MAK PEDESTRIAN TRAFFIC
AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH SEDIMENT TRAP PEDE E SAFE TO
STRIA
AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT. N TRA
GEOTEXTILE FILTER CLOTH (MANDATORY FFIC
11. SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY. WHEN WORKING ON CLAYEY SOILS) ROADWAY
12. WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY CONTRACTOR.
(a) FABRIC WRAP DROP INLET PROTECTION WITH TRENCH
SEDIMENT FENCE: (a) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
(b) ROCK PAD SLOPING AWAY FROM ROAD
CONSTRUCTION NOTES:
1. NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
MATERIALS
2. NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT AREA 0.6Ha PER 100m 2m (MIN)
GRATE WRAPPED IN NON-WOVEN FILTER ROCK: WELL GRADED, HARD, ANGULAR, EROSION RESISTANT ROCK, NOMINAL DIAMETER OF 40 TO 75mm.
LENGTH OF FENCE
CLOTH (WOVEN SEDIMENT FENCE ONLY FOOTPATH STABILISING AGGREGATE: 25 TO 50mm GRAVEL OR AGGREGATE (IF REQUIRED).
3. WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON SMALL WORK SITES, I.E. SEDIMENT COLLECTION PIT
USED IN HEAVY TRAFFIC AREAS) BUILDING
OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS EXCAVATED AROUND INLET GEOTEXTILE FABRIC: HEAVY-DUTY, NEEDLE-PUNCHED, NON-WOVEN FILTER CLOTH (‘BIDIM’ A24 OR EQUIVALENT).
NOT EXPECTED SITE
INSTALLATION
LAND
4. WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE LAYOUT SHALL CONFORM TO 1. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED PERIODS OF RAINFALL, AFTER SLOPE
10m (MIN)
'TYPICAL LAYOUT' ACROSS GRADE. RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY INTERVALS.
5. FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS, WHERE NOT PRACTICAL ONE 2. IF SAND, SOIL, SEDIMENT OR MUD IS TRACKED OR WASHED ONTO THE ADJACENT SEALED ROADWAY, THEN SUCH MUST BE PHYSICALLY
FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED SEDIMENT FENCE
REMOVED, FIRST USING A SQUARE-EDGED SHOVEL, AND THEN A STIFF-BRISTLED BROOM, AND THEN BY A MECHANICAL VACUUM UNIT, IF
PARALLEL WITH TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE
STORMWATER INLET AVAILABLE.
MAKE SAFE FOR
TEMPORARY CONSTRUCTION ENTRY / EXIT: GRATE 3. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY BE WASHED CLEAN AFTER ALL REASONABLE EFFORTS HAVE BEEN FOOTPATH
PEDESTRIAN TRAFFIC
1. ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT. TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.
2. WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER. 4. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH MATERIAL AND THE EFFECTIVENESS OF THE ROCK PAD IS REDUCED TO A
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-231.DWG
POINT WHERE SEDIMENT IS BEING TRACKED OFF THE SITE, A NEW 100mm LAYER OF ROCK MUST BE ADDED AND/OR THE ROCK PAD MUST BE ROADWAY
STANDARD SPECIFICATIONS:
EXTENDED.
DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA) 5. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (e.g. FLOW CONTROL BERM) ARE MAINTAINED IN ACCORDANCE WITH THEIR
AUSTRALASIA BEST PRACTICES STANDARD DRAWINGS & SPECIFICATIONS. IECA STANDARD DRAWINGS (b) TYPICAL DETAILS OF EXCAVATED SEDIMENT COLLECTION TRENCH
GENERALLY AS LISTED BELOW BUT NOT LIMITED TO:
DESIRED OPERATIONAL CONDITION. (c) ROCK PAD SLOPING TOWARD THE ROAD
6. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR POLLUTION HAZARD.
EXIT-01 - CONSTRUCTION EXIT - ROCK PAD
EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
OPTIONAL GEOTEXTILE SPLASH PAD PLACED
BELOW DAM TO REDUCE EROSION AT THE BASE
FIELD INLET PROTECTION
EXIT-03 - ROCK PADS FOR BUILDING SITES
1 OF THE CHECK DAM (GENERALLY NOT REQUIRED) SCALE N.T.S. ROCK PADS FOR BUILDING SITES
CD-01 - CATCH DRAINS SCALE N.T.S.
CD-02 - CATCH DRAINS - EARTH LINED
RCD-01 - CHECK DAMS STABILISE STOCKPILE SURFACE
FF-01 - FILTER FENCE 1
SF-01 - SEDIMENT FENCE
SF-02 - SEDIMENT FENCE
ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP 150mm (MIN)
EARTH BANK FOR UPSTREAM
1.5 MAX
ESC-03 - KERB INLET SEDIMENT TRAPS A A
OUTER WING POINTS A TO BE AT APPROACH FLOWS
Last saved by: HARRYDAVIES(2023-12-18) Last Plotted: 2023-12-18
SEDIMENT
B
R-01 - RENEGOTIATION - GENERAL LEAST 150mm ABOVE CREST B 1 FENCE
1
FLOW DIRECTION 2
GROUND LEVEL 2
SECTION 1-1
FIGURE 1 - LAYOUT PROFILE OF CHECK DAMS
(ROCK CHECK DAMS SHOWN)
ROCK CHECK DAMS TYPICAL STOCKPILE DETAIL
SCALE N.T.S.
SCALE N.T.S.
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn HD Project No. Drawing No. Rev No.
GREG & KERI VENTER DUAL OCCUPANCY EROSION & SEDIMENT CONTROL
Design HD
(IZAROX PTY LTD) OPERATIONAL WORKS - CIVIL NOTES & STANDARD DETAILS
Vert. Datum
AHD
2 JAN STREET Check GM
230703 OPW-C-231 A
RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL
NOOSA HEADS, QLD, 4567 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
18.12.23 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
18.12.23 Status FOR APPROVAL
Size A1
Page 6
EXISTING LEGEND
SUBJECT PROPERTY BOUNDARY
4.00 MAJOR CONTOUR
MINOR CONTOUR
SEWER MAIN DN150
WATER MAIN DN100
U/G TELECOMMS
O/H ELECTRICITY
STORMWATER
FENCE
20.000 SURFACE LEVEL
REINSTATE KERB PROFILE
AS REQUIRED
TOPSOIL & TURF VERGE AREA
PROPOSED LEGEND
AROUND DRIVEWAY CONCRETE DRIVEWAY CROSSOVER
KERB ADAPTORS TO SIDE OF DRIVEWAY
REFER TO IPWEA STD DRG RS-081 INTERNAL CONCRETE DRIVEWAY
JAN STR
EET
CONCRETE PATH
DWELLING
23.0
5.00 LANDSCAPE
450X450 FIELD INLET PIT WITH ROOFWATER STUB. 4.00
LANDSCAPE BUFFER
996
REFER HYDRAULICS FOR ROOFWATER CONNECTIONS 20.
.7 99 50.00 MAJOR CONTOUR 1m INTERVAL
1.50
150Ø UPVC 20
12.5%
MINOR CONTOUR 0.25m INTERVAL
21 RETAINING WALL
.0
1.50
· MINIMUM SETBACK
22.50
2.5%
21.0
20.000 SURFACE LEVEL
0.50
6 3% CROSSFALL/SLOPE
4
22.0 1.2
23.
2
5%
49
75
.0 NOTES:
21
0
2222.5
22.
.00
.2 5
2.36
21.
16.67%
25 1. FOR GENERAL & ROADWORKS/DRIVEWAY NOTES REFER DRG C-011.
1.00 ·
2. INTERNAL STORMWATER PIPES TO BE IN ACCORDANCE WITH AS3500.3.
21.
50
4.50
3.15
23.0 21.
1.00
7 5
25%
NUE
1.50
1.50 0.50 22.50
1.50 22.0
1.50
IA AVE
1 2.67
.47 1.50
23
1.50
2 5 22.25
12.5%
23.7
22.50
·
BANKS
22.50
1.50
450X450 FIELD INLET PIT
5.00
4.00
5
5
UNIT A GARAGE
23.7
.7
22.50
23.50
23
22.0
23.25
4.75
FFL 22.70
UP
23.0
22.75
12.5% 150Ø UPVC
22.50
2.5%
5%
5%
23 16.67%
.57
7 7
23.5% UNIT A 15
23.82 UNIT A GARAGE
FFL 22.70 RP90014
FFL 22.70
·
UP
23.0 UNIT B
FFL 22.70
SAW CUT EXISTING KERB WHERE REQUIRED & MATCH NEATLY.
INSTALL MODIFIED DRIVEWAY CROSSOVER IN ACCORDANCE 23.0
WITH IPWEA STD DRG RS-049 & RS-050 INSTALL ROLLUNDER TO DRIVEWAY AND
ACO K100 GRATED DRAIN BOLT DOWN
(OR APPROVED EQUIVALENT)
·
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-301.DWG
450X450 FIELD INLET PIT WITH ROOFWATER STUB.
REFER HYDRAULICS FOR ROOFWATER CONNECTIONS
Last Plotted: 2023-12-18 4:46 PM
Last saved by: HARRYDAVIES(2023-12-18)
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn HD Project No. Drawing No. Rev No.
GREG & KERI VENTER DUAL OCCUPANCY DEVELOPMENT SITE
Design HD
(IZAROX PTY LTD) OPERATIONAL WORKS - CIVIL PLAN
0m
A1 1:100
2.5 5
Vert. Datum
AHD
2 JAN STREET Check GM
230703 OPW-C-301 A
RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL NOOSA HEADS, QLD, 4567 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
18.12.23 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
18.12.23 Status FOR APPROVAL
Size A1
The text continues on page 7.
Used in these records
Apdx 3 - Civil Eng Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.