ROADWORKS / DRIVEWAY NOTES: STORMWATER DRAINAGE NOTES:
GENERAL NOTES: 1. COMPACT THE EXPOSED SUBGRADE OR LOOSE TOP LEVEL MATERIAL TO A MINIMUM 100% STANDARD MAXIMUM 1. ALL STORMWATER DRAINAGE HAS BEEN DESIGNED AND IS TO BE CONSTRUCTED IN ACCORDANCE WITH
1. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTATION, LOCAL AUTHORITY DRY DENSITY (MDD) TO AS1289. ANY 'SOFT SPOTS' IDENTIFIED BY THE PROOF ROLLING SHALL BE REMOVED AND AS3500, LOCAL COUNCIL AUTHORITY REQUIREMENTS, IPWEA AND QUDM.
SPECIFICATIONS (OR ARCOS GROUP SPECIFICATIONS IF SUPPLIED). ANY POINT OF CONFLICT IS TO BE REPLACED WITH A COMPACTED IMPORTED GENERAL FILL MATERIAL TO THE ABOVE COMPACTION 2. EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH
IDENTIFIED BY THE CONTRACTOR AN WILL BE RESOLVED BY THE SUPERINTENDENT. REQUIREMENTS. IPWEA STD DRG DS-030.
2. THE DEVELOPER IS TO NOMINATE THE SUPERINTENDENT AND/OR THE SUPERVISING RPEQ FOR THE WORKS 2. ALL EXPOSED SUBGRADE AREAS SHALL BE COMPACTED IN LAYERS NOT EXCEEDING 150mm COMPACTED 3. ALL MANHOLES TO BE MIN 1050mm DIAMETER IN ACCORDANCE WITH IPWEA STD DRG DS-010.
AND NOTIFY ALL RELEVANT PARTIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THICKNESS.
4. ALL GRATES & MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS 'D'
3. DIMENSIONS IN METRES (U.N.O). DO NOT SCALE FROM DRAWINGS. USE PRINTED DIMENSIONS ONLY AND IF IN 3. GEOTECHNICAL INVESTIGATIONS REQUIRED IN ORDER TO DETERMINE SUBGRADE PROPERTIES & PREPARATION IN ACCORDANCE WITH IPWEA STD DRG DS-019.
DOUBT ASK SUPERINTENDENT FOR CLARIFICATION. DETAILS. CONTRACTOR TO UNDERTAKE 4-DAY SOAKED CBR ON EXISTING SUBGRADE AND RESULTS TO BE A
MINIMUM OF 5%. TESTING TO BE PROVIDED TO SUPERVISING ENGINEER PRIOR TO PROOF ROLL. 5. ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS 'B' U.N.O WARNING
4. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH COUNCIL APPROVAL CONDITIONS, DEVELOPMENT IN ACCORDANCE WITH IPWEA STD DRG DS-020.
GUIDELINES, ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. 4. LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF TOPSOIL LAYER OR BUILDING SLAB THICKNESS. BEWARE OF UNDERGROUND SERVICES
6. ALL REINFORCED CONCRETE PIPES ARE TO BE INSTALLED USING TYPE 'HS2' SUPPORT AS DEFINED IN AS
5. EXISTING SERVICES AND STRUCTURES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR 5. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE 3725 - LOADS ON BURIED CONCRETE PIPES. IF ALTERNATIVE BEDDING METHODS ARE TO BE USED THE POSITION OF EXISTING UNDERGROUND SERVICES SHOWN
ACCURACY CANNOT BE GUARANTEED. IT IS THE CONTRACTORS RESPONSIBILITY TO ESTABLISH THE LOCATION DRAWINGS AND/OR TYPICAL SECTIONS. PIPE CLASS MUST BE REVIEWED. IS APPROXIMATE ONLY. EXACT POSITION SHALL BE
AND LEVEL OF ALL EXITING SERVICES PRIOR TO COMMENCEMENT OF ANY WORK. DISCREPANCIES SHALL BE 6. CONTRACTOR TO OBTAIN ROADWORKS AND FOOTPATH PERMITS FOR ANY PROPOSED WORKS EXTERNAL TO
REPORTED TO THE SUPERINTENDENT. 7. ALL PIPES ABOVE 300Ø RCP TO BE RRJ CLASS 3 UNO. PIPES 300Ø AND BELOW TO BE UPVC UNO. HDPE/PP PROVEN ON SITE BY THE CONTRACTOR PRIOR TO
THE SITE BOUNDARY. MAY BE USED AS AN RCP ALTERNATIVE FOR INTERNAL AND COUNCIL STORMWATER WHERE APPROVED BY COMMENCEMENT OF CONSTRUCTION
6. ON COMPLETION OF SERVICES INSTALLATION, ALL AREAS SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING 7. SUBSOIL DRAINAGE UNDER KERBS TO BE IN ACCORDANCE WITH IPWEA STD DRG RS-140. REQUEST.
KERBS, FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.
8. ALL TEMPORARY AND FINAL BATTER SLOPES ARE TO BE INSPECTED BY AN APPROVED GEOTECHNICAL 8. STORMWATER PIPE CLASSES HAVE BEEN DESIGNED FOR SERVICE LOADS ONLY, THE CONTRACTOR SHALL
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO COUNCILS INFRASTRUCTURE. ENGINEER. ASSESS ANTICIAPTED CONSTRUCTION LOADS AND UPGRADE THE PIPE CLASSES, IF NECESSARY, IN
SUCH REPAIR OR REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF LOCAL ACCORDANCE WITH AS 3725, AT THE CONTRACTORS COST.
LOCATION OF SERVICES
COUNCIL. EARTHWORKS NOTES: PRIOR TO COMMENCEMENT OF NEW WORK THE
9. UNLESS DIRECTED OTHERWISE STORMWATER STRUCTURES INCLUDING HEADWALLS ARE TO HAVE CONTRACTOR SHALL CONFIRM LOCATIONS, LEVELS AND
8. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN, AG-PIPE DRAINAGE STUBS (WITH END CAP) TO DEWATER DRAINAGE TRENCH.
1. ALL EXCAVATION AND FILLING SHALL BE CONSTRUCTED IN ACCORDANCE WITH AS3798 AND IN ACCORDANCE DETAILS OF EXISTING CONNECTION POINTS AND SERVICE
ENVIRONMENTAL MANAGEMENT PLAN AND WORKPLACE HEALTH AND SAFETY PLAN FOR REVIEW AND
APPROVAL OF PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION. WITH THE CURRENT LOCAL AUTHORITY/EDQ AND ARCOS SPECIFICATIONS. 10. THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES CROSSINGS BY POT HOLING. IF A VARIATION OCCURS
2. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL BEFORE AND STRUCTURES. CONTACT THE ENGINEER PRIOR TO CONSTRUCTION.
9. ALL MATERIALS SPECIFIED ARE TO BE UTILISED, UNLESS WRITTEN APPROVAL FROM THE SUPERINTENDENT,
SUPERVISING RPEQ OR APPROVING AUTHORITY. COMMENCING UP-SLOPE EARTHWORKS. 11. ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES/PITS.
10. THE CONTRACTOR IS TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE HEALTH AND SAFETY 3. THE CONTRACTOR SHALL REMOVE ALL STRUCTURES, DEBRIS AND FENCES FROM THE SITE TO THE 12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION
REQUIREMENTS. SATISFACTION OF THE SUPERINTENDENT. IS IN ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY PROTECTION OF SERVICES
4. EXISTING SURFACE IS TO BE CLEAR OF ORGANIC MATERIAL PRIOR TO THE START OF FILLING. LEGISLATION. THE CONTRACTOR SHALL CONTACT THE RELEVANT
11. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE IN CLOSE PROXIMITY TO NEIGHBOURING LOT
BOUNDARIES OR INFRASTRUCTURE, THE CONTRACTOR IS TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL 5. FILL IS TO BE OF GOOD QUALITY AND FREE OF UNSUITABLE MATERIAL. 13. THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO AUTHORITIES AND ARRANGE FOR RELOCATION AND / OR
MEASURES NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS BACKFILLING OF TRENCHES AND STRUCTURES. PROTECTION OF EXISTING SERVICES AS REQUIRED TO SUIT
MAY INCLUDE THE USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED. 6. FILL TO BE PLACED IN MAXIMUM 200mm LIFTS, UNLESS APPROVED OTHERWISE BY A SUITABLY QUALIFIED
14. THE CONTRACTOR SHALL DEMONSTRATE NO DAMAGE TO EXISTING STORMWATER INFRASTRUCTURE HAS SURROUNDING NEW WORK, CONSTRUCTION LOADINGS AND
CONSULTANT, AND COMPACTED TO SPECIFICATION. OCCURRED DURING THE CONSTRUCTION OF THESE WORKS.
12. THE CONTRACTOR SHALL NOTIFY ALL RELEVANT AUTHORITIES AND ENSURE REQUIRED CONDITIONS HAVE BEEN TO SUIT FINAL FINISHED SURFACE LEVELS AND GRADES.
MET PRIOR TO COMMENCEMENT. THE CONTRACTOR SHALL NOTIFY ARCOS GROUP PRIOR TO COMMENCING 7. NOTWITHSTANDING THE LIMITS OF CUTTING AND FILLING SHOWN ON THE DRAWINGS, THE ACTUAL LIMITS 15. UPON COMPLETION, ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND
WORKS AND RECEIVE WRITTEN CONFIRMATION THAT THE WORKS CAN COMMENCE. SHALL BE DETERMINED ON SITE BY THE SUPERINTENDENT DURING CONSTRUCTION. SIMILARLY, THE FINISHED OTHER BLOCKAGES.
13. CONTRACTOR SHALL PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS IN ACCORDANCE SURFACE LEVELS MAY BE ADJUSTED BY THE WRITTEN DIRECTION OF THE SUPERINTENDENT DURING
WITH COUNCIL REQUIREMENTS UNLESS OTHERWISE ADVISED BY ARCOS GROUP. CONSTRUCTION AFTER AMENDED DRAWINGS HAVE BEEN APPROVED BY COUNCIL.
16. THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER SETTING OUT
DRAINAGE ASSETS FOR APPROVAL BY THE ENGINEER AND/OR LOCAL AUTHORITY.
8. ALL AREAS SUBJECT TO EARTHWORKS ARE TO BE FREE DRAINING WITH A MINIMUM SLOPE OF 1:100 (1%). DESIGN FINISHED SURFACE LEVELS OF STRUCTURES ARE FOR
14. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED; 17. ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE CONTRACTOR'S GUIDANCE ONLY. ACTUAL FINISHED LEVELS
· CONSTRUCTION PRE-START MEETING 9. ALL DRAINAGE STRUCTURES ARE TO BE PRESERVED FROM THE EFFECTS OF STRUCTURAL LOADING THE CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE SHALL BE SET OUT AS DIRECTED ON-SITE IN KEEPING WITH THE
GENERATED BY THE EARTHWORKS. CONTRACTOR, UNLESS IT CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND REQUIREMENTS AND SPECIFICATIONS OF THE LOCAL AUTHORITY
· SET OUT THE RESPONSIBILITY OF OTHER PARTIES. AND ACTUAL FINISHED GROUND LEVELS.
10. ANY AREA DISTURBED OUTSIDE OF THE WORKS AREA SHOWN SHALL BE REHABILITATED TO A MINIMUM OF THE
· DEMOLITION 18. RESIDENTIAL DRAINAGE CONNECTIONS TO KERB AND CHANNEL REFER TO IPWEA STD DRG RS-081.
PRE-CONSTRUCTION CONDITIONS, AT THE CONTRACTORS EXPENSE.
· SUBGRADE PROOF-ROLLS
11. EARTHWORKS BATTERS ARE TO BE TREATED AS FOLLOWS:
· PRE-SEAL PROOF-ROLLS
· 1:4 OR FLATTER TO BE GRASS SEEDED U.N.O
· CONCRETE PRE-POURS
· STEEPER THAN 1:4 TO BE MULCHED & PLANTED IN ACCORDANCE WITH THE LANDSCAPE PLANS
· FINAL INSPECTION 13. TREE REMOVAL WORKS TO BE UNDERTAKEN BY A SUITABLY QUALIFIED AND INSURED CONTRACTOR. TIMBER IS
15. THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, TO BE REMOVED, REUSED OR RECYCLES IN AN APPROPRIATE AND A SUSTAINABLE MANNER WHERE POSSIBLE.
SUCH AS:
● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
● REQUIRED WATER QUALITY OBJECTIVES; SIGNAGE & LINEMARKING NOTES:
● PERFORMANCE MONITORING AND INSPECTION PROCEDURES; 1. ALL LINEMARKING, SIGNAGE AND R.R.P.M's SHALL BE IN ACCORDANCE WITH THE "MANUAL OF UNIFORM TRAFFIC
● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS; CONTROL DEVICES" (MUTCD).
● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS; 2. ALL CARPARK LINEMARKING TO BE IN ACCORDANCE WITH THE DIMENSIONAL REQUIREMENTS OF AS2890
3. ALL LINEMARKING ON AC PAVEMENTS SHALL BE WHITE, TYPE 1 ROAD MARKING PAINT 80-100mm WIDE, REFER
· REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
MRS 11.45 SPECIFICATIONS (U.N.O.)
4. ALL LINEMARKING ON CONCRETE PAVEMENTS SHALL BE GOLDEN YELLOW COLOUR NO. Y14 AS 2700 AND
80-100mm WIDE (U.N.O.)
ENVIRONMENTAL MANAGEMENT NOTES:
5. ALL REDUNDANT PAVEMENT MARKING SHALL BE REMOVED VIA ABRASIVE BLASTING IN ACCORDANCE WITH THE
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL ENVIRONMENTAL PROTECTION MEASURES BEING IMPLEMENTED REQUIREMENTS OF DTMR's STANDARD SPECIFICATION No. MRTS45.
ON SITE PRIOR AND DURING CONSTRUCTION.
6. PROPLE WITH DISABILITY (PWD) CARPARK LINEMARKING TO AS2890.6 (YELLOW CHEVRON AND OUTLINE,
2. NO VEGETATION BEYOND THE EXTENT OF EARTHWORKS OR THAT SHOWN ON THE PLANS IS TO BE UNDERTAKEN
WITHOUT PRIOR CONSENT FROM THE SUPERINTENDENT. YELLOW BOLLARD, BLUE SYMBOL)
3. ALL VEGETATION BEING RETAINED ON SITE MUST BE IDENTIFIED AND PROTECTED FROM DAMAGE. 7. WHEEL STOP SETOUT TO AS2890.1
8. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1743 UNLESS NOTED OTHERWISE
4. EROSION AND SEDIMENT CONTROL IS THE RESPONSIBILITY OG THE CONTRACTOR AND MUST BE IMPLEMENTED
PRIOR TO CONSTRUCTION COMMENCING AND DURING CONSTRUCTION. 9. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO EDGE SIGN:
5. ALL DISTURBED AREAS SHALL BE LEFT IN A STABLE CONDITION. THIS WILL INVOLVE SEEDING OR TURFING WITH · NO KERB = 600mm BEHIND GUIDE POSTS
APPROPRIATE GRASS SPECIES. ANY DISTURBED SLOPES SHALL BE COVERED WITH A SUITABLE FORM OF · BARRIER KERB = 300mm FROM FACE OF KERB
EROSION CONTROL.
6. PIPELINES ADJACENT TO SIGNIFICANT TREES MUST BE INSTALLED BY BORING OR DIRECTIONAL DRILLING · MOUNTABLE KERB = 500mm FROM FACE OF KERB
UNLESS OTHERWISE AGREED WITH THE SUPERINTENDENT. 10. A FLEXIBLE STRIKER BAR SHALL BE PROVIDED IN CONJUNCTION WITH SIGNAGE WHERE CLEARANCE LESS THAN
7. TOPSOIL AND SUBSOIL MUST BE STOCKPILED SEPARATELY AND NOT LOCATED UNDER TREE CANOPIES. 2.3m OCCURS.
8. ALL STOCKPILES MUST HAVE APPROPRIATE SEDIMENT CONTROLS IN ACCORDANCE WITH THE ENVIRONMENTAL 11. CARPARK LINEMARKING TO BE IN ACCORDANCE WITH AUSTRALIAN STANDARD 'AS2890.1 SPECIFICATIONS.
MANAGEMENT PLAN.
9. NO SOIL CAN BE STOCKPILED WITHIN 5M OF ANY CREEK OR WATER COURSE.
10. ANY SOIL DISTURBED ON SITE IS TO BE REUSED ON SITE. ANY UNSUITABLE MATERIAL NOT REUSED MUST BE
DISPOSED OF AT A REGULATED WASTE DISPOSAL FACILITY.
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-011.DWG
Last saved by: HARRYDAVIES(2023-12-18) Last Plotted: 2023-12-18 4:45 PM
North Point Scale Horiz. Datum Client Consultant Project Drawing
LOCAL Drawn HD Project No. Drawing No. Rev No.
GREG & KERI VENTER DUAL OCCUPANCY GENERAL NOTES & DETAILS
Design HD
(IZAROX PTY LTD) OPERATIONAL WORKS - CIVIL
Vert. Datum
AHD
2 JAN STREET Check GM
230703 OPW-C-011 A
RL Datum CIVIL | STRUCTURAL | GEOTECHNICAL NOOSA HEADS, QLD, 4567 Approved Approved Date Signed Sheet
A FOR APPROVAL
Rev Revision Description
18.12.23 LS
Date Approved
COPYRIGHT © All rights reserved.
This work is copyright and cannot be reproduced
or copied in any form without the prior consent
SUNSHINE COAST | BRISBANE | GOLD COAST
www.arcosgroup.com.au | ABN 51 640 311 842
LACHLAN SWANN
RPEQ 21223
18.12.23 Status FOR APPROVAL
Size A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Apdx 3 - Civil Eng Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.