Original source · versioned page text
39 Lorilet 04 Reconfiguring a Lot Code
Movement Network Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Movement Network
Traffic Complies
PO14 No acceptable outcome provided No new traffic generation.
Traffic generated by the development is within the
acceptable capacity of external roads and does not
have an adverse impact upon the functioning of the
road network.
Editor’s Note— Further detail on traffic and the road
network is addressed in Part 9.4.8 Transport Code
Roads and Pathways Not applicable – no new proposed road.
PO15 AO15.1
Development involving the creation of new roads and Where involving the construction of a new road,
pathways ensures infrastructure— road planning and design supports the hierarchy
and functional aspects identified in Council’s
(a) provides convenient, safe and efficient movement Planning Scheme Policy PSP6 on Engineering
for all modes of transport between land use design standards – Roads, drainage and
activities; earthworks.
(b) prioritises pedestrian movement and bicycle use
over vehicle movements; Editor’s Note— Further detail on road and
(c) facilitates efficient, safe and accessible bus pathway networks is provided in Part
services that connect to existing and future public 9.4.8 Transport Code
passenger transport facilities;
AO15.2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.