Skip to the record
The gold standard in government transparency.

Original source · versioned page text

39 Lorilet 04 Reconfiguring a Lot Code

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Performance Outcomes                                      Acceptable Outcomes
(d) provides through roads and minimises the use of The street layout is generally rectilinear and does
    culs-de-sac;                                      not rely on culs-de-sac, or where the use of a cul-
(e) minimises the extent of earthworks required by    de-sac is unavoidable because of the natural
    being sympathetic to the terrain;                 features of the site, it does not exceed a length of
(f) allows for unimpeded and practical access to each 200 metres.
    proposed lot; and
(g) provides for mature street trees.                 AO15.3
                                                          Pathways and pedestrian routes are planned to
                                                          provide clear, safe connections between
                                                          residential, open space, transit stops and retail
                                                          areas, and are located along, or are visible from,
                                                          streets or other public spaces.

                                                          AO15.4
                                                          Sufficient space and soil depth is provided for the
                                                          planting of street trees for shade, amenity and
                                                          habitat purposes.

PO16                                                      AO16                                               Not applicable
The subdivision layout is designed to facilitate          If within 1 kilometre of the Pathways Network
pedestrian and cyclist linkages with adjoining sites in   identified in the Local Government Infrastructure
the immediate area.                                       Plan located in Part 4, the subdivision design and
                                                          layout includes pathways:


                                                          (a) located in accordance with the Pathways
                                                              Network identified in the Local Government
                                                              Infrastructure Plan; or
Log in to download the original file

39 Lorilet 04 Reconfiguring a Lot Code.pdf · 312 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.